1 B904 Status Report by Fred B.
19-April-05 B904 Status Had another power outage last week – still not up Rigged temporary power to PCs and Net box. Rigged temporary power to pcrate and TTC Working for TMB firmware testing – Greg Will work for some board testing – Fred NEED – reliable power Still needed for Cosmic running – TF Need cosmic running to qualify pcrate boards Will conduct cosmic runs with several sets of pcrate boards – certify them – put them in spares crate at Pt5  See more about B904 and Cosmic Test Stand from the web pages CMS Web > MuonWikiHome > MuonCSC > CSCCosmicSlice 6-Nov-19 B904 Status Report by Fred B.

2 B904 Status Report by Fred B.
19-April-05 Physics Week 1st impression – Many people have done a lot of good work 2nd impression – Need to shift gears from CRAFT & Cosmics to BEAM 3rd impression – Need people in DPG & Operations who liason with POG, others with operations, others with … Not just participant in another level but serve as designated liason with group at another level Questions for DPG and Operations Are we ready for first beam injection? HV – can we control as necessary for single beam Are the Halo triggers ready, do we know how to monitor them Is DQM (....) ready to halo? Do we have procedures in place Are we ready for first collisions (at injection energy)? All the above plus? Are we ready for 1st inverse 7 TeV Are we ready for 10 Are we ready for 100 6-Nov-19 B904 Status Report by Fred B.


Download ppt "B904 Status Report by Fred B."

Similar presentations


Ads by Google