Presentation is loading. Please wait.

Presentation is loading. Please wait.

Integrated Double-beta-decay European Activity

Similar presentations


Presentation on theme: "Integrated Double-beta-decay European Activity"— Presentation transcript:

1 Integrated Double-beta-decay European Activity
Paris, November 2007 JRA2 - IDEA Integrated Double-beta-decay European Activity Status of the activity Andrea Giuliani Insubria University, Como, and INFN – Milano, Italy

2 I1 - Isotope enrichment – S. Jullian
See Dominique Lalanne’s talk

3 P1 – 82Se project – D. Lalanne
See Dominique Lalanne’s talk

4 P2 – 150Nd project – S. Pirro Several high T0 thermistors available
Procurement of CaF2, CaMoO4, CdWO4, ZnSe, CaMoO4 crystals Several high T0 thermistors available Ge and Si light detectors tested with 55Fe source

5 Ge light detector tested with 55Fe source
P2 – 150Nd project – S. Pirro Ge light detector tested with 55Fe source CaF2 - 3x3x3 cm3 DE = eV

6 B1 – Cosmogenic induced activity – S. Cebrian – M. Pavan
p on a TeO2, data analysis and final results on activation yields are being completed Experiment in design: p beams (CERN) of 1.4 and 24 GeV on Ge targets. MI group + US collaborators. Experiment running: n on Te at Los Alamos (WNR facility, GEANIE detector). MI group + US collaborators. Activation on Cu brick at exposed at 2000 m in Modane Study on Nd Zn Cd in next months Natural activation on NaI detectors (ANAIS) – Now activation test Collaboration with GEANT4: needs of underground community

7 B2 – Underground crystal growth – J. Morales – S. Capelli
Estimation performed. Severe 210Pb contamination protocol to produce extreme radiopure TeO2 crystals at SICCAS (Bridgman technique) clear codification and check of all production phases purpose dedicated production unit, crystal growth facility and clean room, installed at producer. 6 crystals have been produced in spring 2007, following the agreed protocol. mechanical processing, previously performed at LNGS, have been implemented at producer. new lapping powders have been selected, based on radiopurity requirements new polishing pad have been chosen. new drying and calcination procedures have been tested ICPMS measurements have been performed of the TeO2 powders. See Silvia Capelli’s talk

8 B3 – Rejection of surface radioactivity – M. Pedretti
Polyethylene foils to shield the copper frame Tests on coating of the copper frames with plastic materials Implementation of a full cleaning procedure for copper Mechanical + Chemical + Electrolytic + Plasma (LNL – INFN) First test already made. Second test in progress See Claudia Nones’ talk New tests on surface sensitive bolometers with a new approach derived from the EDELWEISS collaboration

9 B4 – Operation of Ge diodes in liquid nitrogen – S. Schoenert
Development of the argon purification plant. activated carbon CarboAct has been finally selected geometry of the column has been determined: a cylinder with f = 130 mm - l = 650 mm the total mass of the filled in charcoal is 602 g. the column has been constructed in the MPI-workshop and tested Radon emanation of cryogenic storage tanks  were also continued. See Grzegorz Zuzel’s talk


Download ppt "Integrated Double-beta-decay European Activity"

Similar presentations


Ads by Google