Download presentation
Presentation is loading. Please wait.
1
FNAL Hybrid Testing Status
Week of 10/3-10/7
2
FNAL Hybrid Summary As of 10/7/2005
3
TOB Hybrid Testing Failures
This (Last) Week Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 2 one short, two noisy channels 3 many noisy and short channels 2 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels
4
TEC Hybrid Testing Failures
This (Last) Week Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 3 too many noisy channels 2 all chips noisy 1 shorts and noisy channels 5 scratch on PA 1 messy PA 1 too many open, noisy, short channels
5
Fermilab Hybrid Test To Do List
Running 7_2 ARCS code (original) with ACDC we built at Fermilab Faster PC is on, problem with initialization stage (ARC’s not initialized), narrowing down the possible reasons!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.