Presentation is loading. Please wait.

Presentation is loading. Please wait.

FNAL Hybrid Testing Status

Similar presentations


Presentation on theme: "FNAL Hybrid Testing Status"— Presentation transcript:

1 FNAL Hybrid Testing Status
Week of 10/3-10/7

2 FNAL Hybrid Summary As of 10/7/2005

3 TOB Hybrid Testing Failures
This (Last) Week Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 2 one short, two noisy channels 3 many noisy and short channels 2 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels

4 TEC Hybrid Testing Failures
This (Last) Week Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 3 too many noisy channels 2 all chips noisy 1 shorts and noisy channels 5 scratch on PA 1 messy PA 1 too many open, noisy, short channels

5 Fermilab Hybrid Test To Do List
Running 7_2 ARCS code (original) with ACDC we built at Fermilab Faster PC is on, problem with initialization stage (ARC’s not initialized), narrowing down the possible reasons!


Download ppt "FNAL Hybrid Testing Status"

Similar presentations


Ads by Google