Presentation is loading. Please wait.

Presentation is loading. Please wait.

FNAL Hybrid Testing Status

Similar presentations


Presentation on theme: "FNAL Hybrid Testing Status"— Presentation transcript:

1 FNAL Hybrid Testing Status
Week of 10/17-10/21

2 FNAL Hybrid Summary As of 10/21/2005

3 TOB Hybrid Testing Failures
This (Last) Week None Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 2 one short, two noisy channels 3 many noisy and short channels 2 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels 2 Global failure

4 TEC Hybrid Testing Failures
This (Last) Week 1 too many shorts 1 global failure 3 scratch on PA Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 3 too many noisy channels 2 all chips noisy 1 global failure 2 shorts and noisy channels 8 scratch on PA 1 messy PA 1 too many open, noisy, short channels 1 too many shorts

5 Fermilab Hybrid Test To Do List
Running 7_2 ARCS code (original) with ACDC we built at Fermilab. Have a fast PC working, run time is shortened by another 10 minutes. We tested 171 hybrids this week…Record With present conditions we can test 44+/-4 hybrids a day. Our best day was 10/21 with 48 hybrids tested. The Peltier is deteriorating already…..


Download ppt "FNAL Hybrid Testing Status"

Similar presentations


Ads by Google