Download presentation
Presentation is loading. Please wait.
Published byPéter Kocsis Modified over 5 years ago
1
Baseline preamp (as in beam test) Test pulser to simulate MCP-PMT
iTOP new preamp update G. Visser / IU July 12th 2013 Baseline preamp (as in beam test) Test pulser to simulate MCP-PMT Candidate new preamp Dusted off old pulser from STAR MAPMT work. Fast, clean pulse from a simple and low cost circuit. Include similar circuit in new carrier board to pulse through the preamp. Note DC coupled
2
SPICE simulations 5×105 electron signal
output from candidate new preamp output from baseline preamp
3
Prototype measurements
Looks pretty good, on average. Unfortunately, average isn’t good enough. Oscillation problem ought to be solvable (probably a layout/bypassing issue with the prototype). A few day’s effort needed. input output
4
iTOP HVB & front board update
Front board: Finally getting through to Mill-Max about a small customization of the pin body to reduce required insertion depth of mating pin. Quote is in process, asking for each with the #32 and #35 (extra low force) contacts. Will order immediately. Once pins are definitely on order, will design & order test front board (to validate the “thick board blind hole” concept). HVB: Got detailed info and preliminary quote from vendor (Plasma Ruggedized Solutions). They propose to pot using an external mold, and one of their proprietary epoxy formulations Quote is $1250 NRE + $250 min lot (gets us ~6 units), and $36.40 qty 100. Of course, price will change slightly with details of our design tbd. I think it is affordable and we should pursue this.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.