Download presentation
Presentation is loading. Please wait.
Published bySurya Hermawan Modified over 5 years ago
1
Town Hall Assessment and Design Progress Update THRAC
Town Hall Assessment and Design Progress Update THRAC Daedelus Projects McGinley Kalsow & Associates
2
Deteriorated cornice on the West Elevation of Historic Town Hall
Deteriorated cornice on the West Elevation of Historic Town Hall. Note lack of copper or lead cladding. Cohasset Town Hall
3
Detail view of chimney crack.
Cohasset Town Hall
4
Existing asphalt shingle roof is near the end of its life
Existing asphalt shingle roof is near the end of its life. Missing shingles should be replaced before August 30th. Cohasset Town Hall
5
Gutter placement and mounting details have led to some failures
Gutter placement and mounting details have led to some failures. Gutter was going to be attached by town; but long-term solution is to replace gutter with institutional hung gutter. Cohasset Town Hall
6
Loose and bowed clapboards due to poor nailing through insulation board.
Cohasset Town Hall
7
Historic, character-defining features remain at this impressively sized and proportioned space. Re-creation of such space is costly today. Cohasset Town Hall
8
Much of the required Town Hall infrastructure is current, code-conforming and functioning well. Existing Town Clerk’s vault meets the Secretary of the Commonwealth’s requirements for record storage. Cohasset Town Hall
9
Lower Level Records Storage Vault is conforming and functions well.
Cohasset Town Hall
10
The quality of the interior space is very good at some offices.
Cohasset Town Hall
11
Structural Analysis Cohasset Town Hall
12
Historic Color Analysis
Cohasset Town Hall
13
Site Options Cohasset Town Hall
14
Cohasset Town Hall
15
Cohasset Town Hall
16
Programming Cohasset Town Hall
17
Project Phases and Process
Owners Project Manager & Designer Selection Design Program/Feasibility Study Approval to Proceed to Design and Bid Schematic Design Design Development Construction Documents Prequalification & Bidding Approval to Proceed to construction Construction Completion & Occupancy
18
M.G.L. 149 Building Construction Contracts Procedure:
Contracts above $10,000,000 prequalification of general and filed sub-bidders required Contracts below $10,000,000 prequalification is optional DCAMM certification required for general bidders above $150,000 DCAMM certification required for filed sub-bidders above $25,000 (17 categories) Invite sealed bids from prequalified general and filed sub contractors Bid deposit of 5% of the value of the total bid or sub-bid required Contract must be awarded to lowest responsive and responsible bidder 100% Performance and Payment bond required Must pay prevailing wage