Presentation is loading. Please wait.

Presentation is loading. Please wait.

ELCITA UPDATE August 2019.

Similar presentations


Presentation on theme: "ELCITA UPDATE August 2019."— Presentation transcript:

1 ELCITA UPDATE August 2019

2 ESTATE MAINTENANCE WORK

3 Culvert construction infront of Tata Power Solar

4 4 Shuttle Bus – User’s data
June July August

5 Elcita launched Citizen App for iPhone users
Android users -5440

6 Doddathoguru Traffic Signal is commissioned

7 Sewage Treatment Plant
Sl. NO. Month Total Raw Water Total Treated Water Efficiency 1 July 5258 5108 97.14% 2 June 5264 5093 96.75% 3 May 5756 5617 97.5% Sl. No. STP with Quantity Description of Work Status of work 1 2. 3. 4. CSTP -300 KLD E-SBR 7KLD SBT 8 KLD Kam-avida Vehicle Raw Sewage pump – Repair & service Street Light fixing Sewage submersible Pump – MSME Septic tank Water parameter Test Sewage Submersible Pump –Repair , Reinstall and Service Panel revamping wire connections Welding work - Ball chamber assembly Removed bent pipe at loading and unloading points in sewage tanker Suction Pump Installation and commissioned Work completed Work completed

8 Sl. No. STP with Quantity Description of Work Status of work 5. RCC Drains Declogging of drain at Velankani Road Chamber cleaning & mesh Fixing at Canara bank road to eliminate sewage overflow on road Drain blockage removed At Y-junction, Phase 2 Drain declogging At HP Entrance Work completed Work completed 6. E-Toilets Joint inspection has done with Eram scientific & Mom prepared regarding the inspection SMPS Unit repaired and replaced at HP Skywalk E-Toilet Rewiring connection has done at Pump house E-Toilets Work Completed

9 Sewage submersible pump repair & Reinstalled at MSME
Rewiring work at E-toilet SMPS UNIT AT E-TOILET Drain Velankani Road Drain Y- Junction Road, Phase -II

10 Revamping of Ball Assembly – KA59 6287
Welding work for Suction Point of loading & unloading KA Suction Pump Installation KA Fixing of Street Light at CSTP – 2 Nos.

11 Raw Sewage Pump Repair & Service , Reinstallation @ CSTP
Students Visit @ CSTP Suction Pump Installation KA

12 PROPOSED LAND TO BE ACQUIRED FOR JN IMPROVEMENT
(survey done by TTIC (2007)) YOKOGAWA JUNCTION IFIM – 120 SQM INFOSYS MLCP – 100 SQM VELANKANI JUNCTION VELANKANI – 64 SQM KPTCL – 45 SQM BHEL JUNCTION BHEL (Erkadi Side) – 238 SQM BHEL (Equinox Side) – 236 SQM 3M (Erkadi Side) – 252 SQM OPTO CIRCUIT– 12 SQM ERKADI JUNCTION ERKADI SYSTEMS– 20 SQM SIEMENS JUNCTION EDGE VERVE – 90 SQM PETROL BUNK JUNCTION PETROL BUNK – 37 SQM C DOT – 25 SQM RS JUNCTION RS ELECTRONICS – 71 SQM CELSTREAM – 68 SQM ITI – 90 SQM INTERPLEX – 74 SQM OTTERA JUNCTION TIMKEN – 78 SQM ELCITA FOOTPATH – 91 SQM

13 TENDERS ANVIL INFRASTRUCTURE WORKS
RCC Drain & Footpath (West Avenue 2) Velankani Drive – 175 Lakhs RCC Drain & Footpath (West Avenue 4) IFIM Side – 39 Lakhs RCC Drain & Footpath West Avenue 3 (KPTCL Junction to Yokogawa Junction both sides) – 168 Lakhs RCC Drain & Footpath (West Avenue 9) INTERPLEX SIDE – 75 Lakhs Asphalting - West Avenue -10 (Coffee day Jn to Fire Station Jn) – Lakhs Concrete Road - Fire Station Inside roads – 15 Lakhs MS Railing (West Avenue 9) Both Side – 72 lakhs MS Railing (West Avenue 6) Both Side – 62 Lakhs Providing and laying asphalt along East Avenue 3 – 43 Lakhs Construction of Median along East Avenue 3 – 35 Lakhs

14 TENDERS ANVIL ELECTRICAL WORKS
The 7 –Way RMU shifting in West Avenue-3 ( Near Timken) – 20Lakhs Over Head line converting to UG cable in West Avenue-10 ( Canara Bank to Fire station) – 70 Lakhs New Compact RMU to be installed in West Lane-10 ( Near Bank of India) Lakhs

15 TENDERS ANVIL SUTAINABILITY WORKS DG set for SWM facility– 6 Lakhs
Baling machine for SWM facility – 5 Lakhs SWM vehicle for collecting food waste (TATA 407) - 10Lakhs Blower repair and Diffusers - 2 Lakhs DO Sensor – 50 Lakhs Online monitoring system – 50 Lakhs

16 Commencement Certificate Occupancy Certificate
TOWN PLANNING KHATHA CERTIFICATES, BUILDING LICENSE , COMMENCEMENT CERTIFICATES AND OCCUPANCY CERTIFICATES ISSUED SINCE ONWARDS Details FY FY FY FY FY   FY (As on FY (As on ) Khatha  6 18 12 11  28 9 Building License 2 13 25 35 32 40 14 Commencement Certificate 1 4 7 17 3 Occupancy Certificate Nil 24

17 E-city segregates- 4th set
ELCITA SWM Conveyor extension E-city segregates- 4th set Conveyor extension Lemon Tree Amphenol Flextronics Tata Power SED Yokogawa Arvind mills Attra Exa Thrmometrics Exa Senselabs ELCIA Conveyor extended by 8 feet

18 Drum distribution by HD to reduce mixed waste at companies
MSGP Visit for sustainability park

19 Median plantation at PHASE-2
ELCITA Nursery Distribution Count August 223 Total 4423 Median plantation at PHASE-2

20 Students visit to OWTP/Nursery
Clay Ganesha making workshop for students and Employees.

21 WATER MANAGEMENT *This change is to align to the BWSSB billing cycle
Meter/connection Charges – Rs. 480/- to be collected every month from consumers (recommended by Govt. Auditors) New (water) connection charges – Rs. 1,000/- to be collected (recommended by Govt. Auditors) Proposal of increase the rate of BWSSB water Change of water billing cycle of ELCITA* *This change is to align to the BWSSB billing cycle Current billing cycle Recommended billing cycle 1st to last date of the month From 5th of every month to 4th of next month

22 Security and Traffic Related
Joint mock drill by CISF E-city, CISF Infosys and Garuda Force conducted on 29 June 2019 in Infosys M&P Campus Installation of 16 Signals completed, 6 Signals operating on Dynamic Mode using Google Maps. 1 Additional Signal installed at Doddathogur Gate CEO, CSO attended Meet at Commissioner of Police Office for Bangalore Traffic Ms. Isha Pant, DCP, South addressed Security heads on 26 Aug 2019 to sensitise Ecity on current Threat Perspectives.

23 Security and Traffic Related
Yulu Statistics July 2019

24 Security and Traffic Related
Bounce Statistics July2019

25 THANK YOU


Download ppt "ELCITA UPDATE August 2019."

Similar presentations