Download presentation
Presentation is loading. Please wait.
Published byHenrik Pålsson Modified over 5 years ago
1
IEEE 802 IMT-Advanced Technology Proposal Process
Month Year doc.: IEEE yy/xxxxr0 March 2008 IEEE 802 IMT-Advanced Technology Proposal Process Date: Authors: John Notor, Cadence Design Systems, Inc. John Doe, Some Company
2
Month Year doc.: IEEE yy/xxxxr0 March 2008 Approval Process A Working Group (WG), or WG combinations, submits a draft Radio Interface Technology (RIT) proposal, or a draft proposal for a Set of RITs (SRIT) to for review: Proposal requirements: draft must be complete, including self- evaluations, per ITU-R WP5D submission requirements. The WG must approve the draft prior to submission to reviews proposals for completeness and accuracy relative to WP5D requirements for submission: If finds the proposal is not in compliance with WP5D requirements, returns the proposal to the WG with a list of discrepancies and, where possible, suggestions for corrections. If finds the proposal in compliance with WP5D requirements, approves the proposal, forwarding the proposal to the EC for review/approval. After EC approval, the IEEE SA ITU-R liaison will submit the proposal to WP5D, with appropriate cover letter. John Notor, Cadence Design Systems, Inc. John Doe, Some Company
3
Month Year doc.: IEEE yy/xxxxr0 March 2008 Critical Milestones Last date for WG’s to submit technology proposals (final WG approved drafts) to for review: June 12, 2009. Last date for approval of proposals for submission to the EC: July 16, 2009. Last date for EC approval of technology proposals: July 17, 2009. Last date WP5D will accept technology proposals: October 2009 (exact date is TBD). Slide 3 John Notor, Cadence Design Systems, Inc. Page 3 John Doe, Some Company
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.