Download presentation
Presentation is loading. Please wait.
1
FNAL Hybrid Testing Status
Week of 9/19-9/23
2
FNAL Hybrid Summary Caution: All fail determinations are done.
As of 9/23/2005 Caution: All fail determinations are done.
3
TOB Hybrid Testing Failures
This (Last) Week 1 Too many opens & noisy 1 Too many shorts & noisy 2 Too many shorts Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 2 one short, two noisy channels 2 many noisy and short channels 2 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels
4
TEC Hybrid Testing Failures
This (Last) Week 1 large scratch on PA 1 messy PA 1 too many open & noisy Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 2 too many noisy channels 1 all of 4 chips noisy 1 shorts and noisy channels 5 scratch on PA 1 messy PA
5
Fermilab Hybrid Test To Do List
Running 7_2 ARCS code (original) with ACDC we built at Fermilab Prefer to build ARCS at Fermilab Nothing done for this….. Faster PC should come on-line next week Replaced the Peltier unit (see following slides) Deciding to pass hybrids with noisy edge channels
6
Peltier Unit: Old vs New
From UCSB website
7
Time Line with new Peltier
Something to discuss Plate and Sensor-1 Other Sensors
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.