Presentation is loading. Please wait.

Presentation is loading. Please wait.

FNAL Hybrid Testing Status

Similar presentations


Presentation on theme: "FNAL Hybrid Testing Status"— Presentation transcript:

1 FNAL Hybrid Testing Status
Week of 9/19-9/23

2 FNAL Hybrid Summary Caution: All fail determinations are done.
As of 9/23/2005 Caution: All fail determinations are done.

3 TOB Hybrid Testing Failures
This (Last) Week 1 Too many opens & noisy 1 Too many shorts & noisy 2 Too many shorts Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 2 one short, two noisy channels 2 many noisy and short channels 2 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels

4 TEC Hybrid Testing Failures
This (Last) Week 1 large scratch on PA 1 messy PA 1 too many open & noisy Cumulative 2 damaged at repair 2 too many noisy one open 1 two chips noisy and shorted 2 too many noisy channels 1 all of 4 chips noisy 1 shorts and noisy channels 5 scratch on PA 1 messy PA

5 Fermilab Hybrid Test To Do List
Running 7_2 ARCS code (original) with ACDC we built at Fermilab Prefer to build ARCS at Fermilab Nothing done for this….. Faster PC should come on-line next week Replaced the Peltier unit (see following slides) Deciding to pass hybrids with noisy edge channels

6 Peltier Unit: Old vs New
From UCSB website

7 Time Line with new Peltier
Something to discuss Plate and Sensor-1 Other Sensors


Download ppt "FNAL Hybrid Testing Status"

Similar presentations


Ads by Google