Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flexible Services iNotice Board Friday April 3, 2015

Similar presentations


Presentation on theme: "Flexible Services iNotice Board Friday April 3, 2015"— Presentation transcript:

1 Flexible Services iNotice Board Friday April 3, 2015
3/14/13 • Watervliet Avenue • cdta.org 1

2 STAR Daily Performance for Friday April 3, 2015
Actual Trips: 304 Actual Passengers Transported: 339 Overall On Time Performance 93.42% Scheduled 52.96% Appointment Time: 100% Productivity: 1.44 110 Watervliet Avenue • cdta.org 2

3 Advantage Transit Daily Performance for Friday April 3, 2015
Actual Trips: 743 (71%) Actual Passenger Transported: 767 Overall On Time Performance: 99.27% Scheduled: 99.33% Appointment Time: 98.67% Productivity: 7.58 % 110 Watervliet Avenue • cdta.org 3

4 STAR & Advantage Overall Daily Productivity for Friday April 3, 2015
Total Trips: 1047 Trip Per Hour: 5.80 Actual Passengers Transported: 1106 110 Watervliet Avenue • cdta.org 4

5 STAR & Advantage Space/Passenger Type Friday April 3, 2015
STAR Transported: Ambulatory Wheelchair / Scooter, Etc Advantage Transported: Ambulatory 8- Wheelchair / Scooter, Etc Total : Ambulatory Wheelchair / Scooter, Etc Note: Passenger count can be higher than trips performed. This includes all passengers except SVA. 110 Watervliet Avenue • cdta.org 5

6 Flexible Services Performance Goals
On Time Performance Goal : 95% Overall On Time Performance (STAR and Taxi) On time is defined as no more than 0 minutes early or 25 minutes late for a scheduled trip Productivity Per Hour Goal : 2.0 Overall Passenger trips per revenue hour (STAR and Taxi) Total revenue hours operated monthly divided by number of completed trips 110 Watervliet Avenue • cdta.org 6


Download ppt "Flexible Services iNotice Board Friday April 3, 2015"

Similar presentations


Ads by Google