Download presentation
Presentation is loading. Please wait.
1
Jonathan Young ColumbiaGrid
SRWG’s Compliance Subgroup July 30, 2015 Salt Lake City, UT
2
Discussion Topics Data Preparation Manual (Approval Item)
Data Preparation Manual Emerging Topics Collection of GIC Data Replog Dynamic and PowerFlow Case Check
3
DPM: Update Removal of all references to standards and NERC defined roles No apostrophes in data strings Pmax value used in Q table Phase shifting transformers modeled as phase shifting transformers RAS CEII and FISMA addition Miscellaneous minor edits
4
DPM: Possible Future Additions
Base Load Flag inconsistancies Multiple shunts on a bus Duplicate bus numbers Other option for turbine type Generators on BES buses Change “Emergency Ratings” to “Contingency Ratings” RAS naming convention
5
Spread Sheet Reviews Collection of GIC Data Current Replog: 16LW1-OP
Dynamic and PowerFlow Case Check
6
Questions/Comments?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.