Q2 Bus Update C. Narug, R. Bossert 6/27/2019
2
Mock Up Progress Anthony continues work on mockup
Curved Splice Fixture drawings in review Will be ordered when done for curved section in mockup 10/7/2019
3
Return End Fixture To control the movement of the bus, after the cold mass is sealed, a hold down fixture was created for the return end of the magnet. Will be made primarily of G11 10/7/2019
4
Hold Down Fixture Tight hole to control position
Oversized hole to allow for gentle entry Corners will be smoothed 10/7/2019
5
Lead End Bus modeled Hold down fixture attach to other components
Still very rough design Alternative designs being considered 10/7/2019
6
Connection Spider To restrict the movement of the bus in the connections between the Q1/Q2/Q3 magnets, a structure is needed To account for any vertical and rotational tolerances, structure needs some adjustability G11 structure with 316 Stainless Steel Bolts and Springs will be used to control tolerance Shims can also be used Desired Position Current Position Potential Position 10/7/2019
7
Connection Spider Details
Radial tolerance of -0.5 mm to +4.7 mm OD of 50 mm Shoulder Bolt with #6 threading 0.5 mm gap Gap for 0.5 in long spring No radial tolerance 10/7/2019