Presentation is loading. Please wait.

Presentation is loading. Please wait.

UNECE CS/OTA Test Phase

Similar presentations


Presentation on theme: "UNECE CS/OTA Test Phase"— Presentation transcript:

1 UNECE CS/OTA Test Phase
RDW Clusters Feedback Leiden July 17-18, 2019

2 General Feedback Assessments were positive
Mutual understanding for importance and content of regulation with respect to CS and SU Inherent interest in participation & execution in test phase Impressive Technical solutions presented

3 Gaps CS Depth of Evaluation by TS/AA is undefined
Subjective scope of assessment Depth of documentation provided to TS/AA is unstandardized How will reporting of assessments by TS to AA be?

4 General Gaps CS Information document
Threat Analysis and other result might be confidential Only reference in the info-doc Open interfaces for truck manufacturers Brakes, Fleet Management, EOBD

5 Threat Analysis Subjectivity possible
Attacker profile based could give more uniformity For further discussion

6 Enforcement of Regulation CS
Products developed before regulation enforcement Exception Process Objective of Requirements Clear Instructions for initial setup and preparedness Execution of Audit - Confidentiality

7 Technical Services and Qualification
Competence Confidentiality Impartiality Liability Trustworthiness

8 Thank You


Download ppt "UNECE CS/OTA Test Phase"

Similar presentations


Ads by Google