Download presentation
Presentation is loading. Please wait.
1
WT Activities F2F meeting London, March 2018
2
List of Topics of WT interest
List of items of WT interest: MW Specific model (TR ) Core Model alignment Device Management Interface Profile now part of specific DMIP project Synchronization (PTP) Integration with ONAP ETH PHY model implementation Mediator management interface Resilience on SDN network (SDN Controller resilience)
3
WT Activities Coordination performed in weekly WT call with presence of relevant WT vendors and operators (AT&T, DTAG, Telefonica). PoC as way to proof model implementation (with defined methodology to stay in five working days). “Mediator” concept in order to implement quickly new/modified model. CENTENNIAL as repository of open source code for WT.
5
ONAP SDN-R sub-project
6
PoC 5 Date: Q4 2018 Location: Telefonica Germany
Even if the PoC 5 will be done after the SDN World Congress, SDN World Congress would be occasion to promote the 5th PoC coming: We need to contact ONF Speaker to understand which ONF contributions will be presented and how PoC 5 can be advertize; We could link the PoC 5 with ONAP activities
8
PoC 4.1
9
Other aspects We need to improve liasons to other standard bodies to inform about the intitiative.
10
END OF PRESENTATION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.