2 I R R Internal Rate of Return
Virtual University of Pakistan 2 2 2 2 2 2 2 2 2 2 2

3 Virtual University of Pakistan
What is IRR ? The discount rate often used in capital budgeting that makes the net present value of all cash flows from a particular project equal to zero. Generally speaking, the higher a project's internal rate of return, the more desirable it is to undertake the project. As such, IRR can be used to rank several prospective projects a firm is considering. Assuming all other factors are equal among the various projects, the project with the highest IRR would probably be considered the best and undertaken first. IRR is sometimes referred to as “Economic Rate of Return (ERR)". Virtual University of Pakistan

4 FINDING IRR (Trial & Error Method with Interpolation Formula)
A project involves an initial outlay of Rs. 240,000. The estimated net cash flows for the project are as given: The company’s required rate of return is 13 percent. Calculate the IRR for the project. Is the project feasible assuming all other factors are equal ? Years Cash Flows (Rs.) 1. 140,000 2. 80,000 3. 60,000 4. 20,000 5. Virtual University of Pakistan

5 Trial & Error Method (By applying different discount rates)
At 15 % discount rate: NPV = - 240,000+[140,000/(1.15)]+[80,000/(1.15)2]+[60,000/(1.15)3]+[20,000/(1.15)4]+[20,000/(1.15)5] = - 240, , , , , ,944 = - 240, ,059 = Rs. 3,059 At 17 % discount rate: NPV = - 240,000+[140,000/(1.17)]+[80,000/(1.17)2]+[60,000/(1.17)3]+[20,000/(1.17)4]+[20,000/(1.17)5] = - 240, , , , , ,122 = - 240, ,357 = Rs. – 4,643 Virtual University of Pakistan

6 Virtual University of Pakistan
Finding By using 15% rate we have a positive figure that is greater than zero whereas by using 17% rate we have a negative figure that is lesser than zero. NPV appears to be zero between 15% and 17%, so IRR is somewhere in that range. By using INTERPOLATION Technique or Formula, we can find that the IRR is about 15.79%. Virtual University of Pakistan

7 Interpolation Technique (For Finding IRR)
Rate NPV Rs.3,059 IRR Rs.4,643 X Rs.3, Rs.7,702 X Rs.3,059 0.02 Rs.7,702 =

8 Interpolation Technique (For Finding IRR)
X IRR = Lower Rate + X IRR = IRR = or 15.79% Virtual University of Pakistan

9 Virtual University of Pakistan
OR Virtual University of Pakistan

10 Interpolation Formula (For Finding IRR) Virtual University of Pakistan
IRR = Lower discount Rate + Difference between the two discount rates x (NPV at lower discounted rate / absolute difference between the NPVs of the two discount rates) = 15 + ( 17 – 15 ) x ( 3,059 / (3,059 – ( )) = x ( 3,059 / 7,702 ) = x = IRR = % Approx. Virtual University of Pakistan

11 Now Applying 15.79%, We have NPV nearer to Zero
+[60,000/(1.1579)3]+[20,000/(1.1579)4]+[20,000/(1.1579)5] = - 240, , , , , ,609 = - 240, ,962 NPV = Rs  Nearer to Zero Virtual University of Pakistan

12 Virtual University of Pakistan
Project Feasibility The project is feasible as its Internal Rate of Return (IRR) is greater than the company’s required rate of return, assuming all other factors are equal*. *( If there are two mutually exclusive projects and both have IRR greater than the company’s required rate of return then the project with higher NPV will be preferred. In other words, other capital budgeting techniques will be employed. ) Virtual University of Pakistan

13 Virtual University of Pakistan
Dear Students ! It is hoped that….. You’d be now able to find out IRR easily. . . . GOOD LUCK . . . Instructor MGT201 Virtual University of Pakistan Virtual University of Pakistan


Download ppt "Financial Management ( MGT201 ) Internal Rate of Return (IRR)"

Similar presentations


Ads by Google