1 March Joint Powers Authority Overview
October 1, 2019 Dr. Danielle Kelly Executive Director March Joint Powers Authority “Improving Quality of Life – One Job at a Time”

2 March Realigned April 1, 1996 March ARB Surplus Property March JPA
2200 Acres Surplus Property 4400 Acres March JPA 3500 Acres

3 Building Area Completed
Office: ,000 s/f City of Moreno Valley Business Park/ ,647,709 s/f Mixed Use LNR USDA March Life Care Joint Warfare Green Acres Airport ,109 s/f Meridian Moreno Valley Park City of Riverside Food Production/ Industrial: ,196,300 s/f March Air Reserve Base General Old G.C. Warehouse/ 6,262,450 s/f Industrial Ben Clark March Inland Port March Inland Port Altavita Total ,986,568 s/f WMWD County of Riverside City of Perris 3

4 Three Key Planning Areas

5 Three Key Planning Areas
City of Moreno Valley City of Riverside City of Perris County of Riverside 5

6 Fiscal Impacts of March JPA

7 Regional Economic Impacts
Current Direct Economic Impact = $484M/yr FY 2018 Tax Increment Generated for County = $6.02M MVUSD = $1.92M VVUSD = $1.19M Local Jurisdictions = $3.84M Direct Economic Impact at Buildout = $4.6B/yr

8 Capital Improvements

9 Heacock Channel March JPA, Moreno Valley, RCFCWCD & March ARB
$15 Million Construction started Fall 2017 Complete December 2018 Construction should start this fall. Reusing grant EDA grant funds. 9

10 Moreno Valley/ March Field Station
LNR USDA March Life Care Joint Warfare Green Acres Meridian Moreno Valley Park March Air Reserve Base General Old G.C. Operational Date: June 2016 Ben Clark March Inland Port March Inland Port AFVW WMWD 10

11 Moreno Valley/ March Field Station
City of Moreno Valley LNR USDA March Life Care Joint Warfare Green Acres Meridian Moreno Valley Park City of Riverside March Air Reserve Base Operational Date: June 2016 Shelters constructed General Old G.C. Ben Clark March Inland Port March Inland Port AFVW WMWD County of Riverside City of Perris 11

12 Van Buren / I-215 Overpass Funding March RDA (Bond) $20 Million
Prop 1B $10 Million RCTC (ED) $10 Million RCTC (FHWA) $10 Million LNR $7 Million TUMF $2 Million March RDA $1.4 Million $60.4 Million $60.5Million project should be complete by January 2014

13 Van Buren Boulevard Widening
City of Moreno Valley LNR USDA March Life Care Joint Warfare Green Acres Meridian Moreno Valley Park City of Riverside March Air Reserve Base Interchange Completed: July 2014 Phase I: Completed February 2016 General Old G.C. Ben Clark March Inland Port March Inland Port Phase II: Completed June 2018 AFVW Phase III: Construction began October 2018 $25M Project WMWD County of Riverside City of Perris 13

14 Cactus Channel 14

15 West March Master Drainage Plan
15

16 Questions? March Joint Powers Authority
“Improving Quality of Life – One Job at a Time”