Meeting of the Strategic Development Group
Point 4: Update on the EPSS project and next steps 17 June 2009
2
Meeting of the Strategic Development Group
Background Context: Increasing demand (content, responsiveness and timeliness) at European level for social statistics (disabilities, victimisation, ageing society…); Development of social surveys topic by topic (without any integration): need for rationalisation. 2005-September 2008: development of EHS/E4SM (sytem of survey modules). September 2008-January 09: Revised concept (new name: EPSS). Special DSS meeting held on 13 January 09. 17 June 2009 Meeting of the Strategic Development Group
3
EPSS: the medium-term strategic project for social surveys
1st quarter 2009: Discussions in Eurostat on the production method of EU statistics in the next decade EPSS to be revised in order to be fully in line with the new overall strategy; EPSS, a 3-year rolling programme, is a first step of a complete re-engineering of social statistics (to be implemented after the next Census round); Proposed starting date: 2012 (with as a transitional period); Use of art 14.2 of the new Statistical Law for new modules not covered by a framework regulation; 17 June 2009 Meeting of the Strategic Development Group
4
Beyond EPSS: Long-term re-engineering social statistics - first tracks
Challenge to achieve a complete re-engineering of social statistics; Implementation of the strategy (key components): Consistent programming of social surveys (EPSS); Setting-up of the basis for comprehensive data integration (« core variables project » as first basis); Increased use of administrative data; Use of new data sources; Increased ESS-wide collaboration proposal to create an ESSNet on data linking and an horizontal ESSNet in 2010. 17 June 2009 Meeting of the Strategic Development Group
5
Meeting of the Strategic Development Group
Next steps September 2009: in-depth discussion during the DSS meeting (theme of the workshop: “Re-engineering of social statistics: a perspective”); EPSS rolling programme to be discussed in DSS meeting of September 2009 and endorsed by the ESSC later on in 2009. 17 June 2009 Meeting of the Strategic Development Group
6
Meeting of the Strategic Development Group
Conclusion The SDG is invited to discuss on the overall proposed strategy for social statistics and more particularly: The proposed implementation of EPSS, covering social surveys, as the first step of this strategy; The very first proposed outline for the second step aiming at defining an overall re-engineering of social statistics; Integration as a key element of this long-term strategy; The increased use of administrative sources; The use of new tools (in particular ICT tools); The possibility and usefulness to create in 2010 an ESSNet either dedicated to the overall re-engineering of social statistics or focussed on data linking. 17 June 2009 Meeting of the Strategic Development Group