Download presentation
Presentation is loading. Please wait.
1
WLTP IWG Meeting schedule First half 2020
WLTP-28-19e_rev1 WLTP IWG Meeting schedule First half 2020
2
29th WLTP IWG, January 2020 Geneva, in conjunction with GRPE Monday 13 Jan: WLTP IWG (morning session in parallel with EVE) Tuesday 14 Jan: morning only SG EV (if required SG EV issues might be put on the WLTP IWG agenda on Monday) Invitation and preliminary agenda will be uploaded soon. Preliminary Agenda: Final check WD UNR WLTP (includes R83) (informal if required) Informal documents: Amendment#6, Gear shift programming code, Low T, OBD Report to GRPE-80 SG EV
3
Intermediate meeting 19-20 February 2020 (tbc)
Brussels, ACEA offices (tbc) Objective: Preparation WD Amd#6 (includes Low T and OBD) Final drafting and problem solving Deadline WD Mid March 2020 (tbc) Invitation will be uploaded shortly after 29th WLTP IWG
4
30th WLTP IWG, April 2020 ICAT CENTRE 2, Sector-11, IMT MANESAR, Gurugram, Haryana, India Location: Distance from Delhi Airport : 37 Km Places of interest: Delhi: 1.5 hrs from venue Agra: 3 hrs from Delhi Jaipur: 3 hrs from Delhi Temp : Max 37 deg C, Min 22 deg C Visa required. Invitation will be distributed in October. Preliminary Agenda: Final check WD Amd#6 (includes Low T and OBD) SG EV? WLTP IWG: proceed after mid-2020?
5
31st WLTP IWG, June 2020 Geneva, in conjunction with GRPE Final meeting? Current mandate WLTP IWG ends Mid-2020. Agenda tbd
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.