1 Project/program update
Bishop Airport Project/program update

2 Bishop airport update Construction Status
Passenger Service Evaluation Status Regional Considerations

3 Bishop Airport construction status
Backup Generator Complete $350,000 Airfield Lighting Project $2,593,000 Airport Layout Plan 95% Complete Will be finalized after final review of Phase II Passenger Traffic Study Crack Seal, Pavement Marking, and Security Fencing Project $1,598,000 Terminal Apron Rehabilitation and Overall Pavement Testing $1,333,000 Testing and design underway. Construction to start late summer.

4 Passenger traffic evaluation status
Part 139 Evaluation Informal Review Performed by FAA Current and ongoing projects and programs informed by the informal Part 139 Evaluation Passenger Traffic Study Phase I Met with several airlines Discussed market data Got airline perspective on Eastern Sierra Met with Mammoth Mountain Completed

5 Passenger traffic evaluation status
Passenger Traffic Study Phase II Review Existing Aviation Demand Forecasts Review Economic Trends Review Tourism Trends Review Historical Aviation Trends Prepare Short-Term Annual Forecasts Prepare Long-Term Annual Forecasts Prepare Peak Hour Forecasts Complete Documentation and Coordination Undergoing Final Administrative Review

6 Costs and phasing Phase I Terminal Building Parking $1.1 Million
Allows for scheduled CRJ200, CRJ700, Q400 and weather alternate use Phase II Runway Width Restoration Terminal Apron Rehab – Phase 2 Upgraded Baggage Claim/Covered Walkway New Fire Crash Equipment $4.9 Million Allows for Phase I Service plus Scheduled A319 or B737 Service

7 Costs and phasing Phase III Parallel Taxiway Pavement Rehabilitation
Runway Pavement Rehabilitation 10+ Years in the Future $16.4 Million Totals Phase I and II Total Cost $7 Million $5.3 Million FAA Contribution All Phases $23.4 Million $20 Million FAA Contribution

8 Regional considerations
4,124’ elevation 3 runways (7,500’ x 150’) 240,000 pounds runway strength 400’ approach minimum 2 federal navaids Bishop Airport Inyokern Airport

9 Regional considerations
Bishop Airport Opportunities Completed all new airport lighting, signs, electrical vault with standby power for airfield and terminal meeting Part 139 requirements New pavement sealing and marking project complete Capable of serving C-III aircraft, such as 757, 737, MD-80, A-319, and smaller Q- 400, CRJ-700 Extensive land available for expanded terminal facilities and direct roadway access Centrally located to serve Mammoth Lakes, Inyokern as well as Inyo County and adjacent Nevada

10 Regional collaboration
Collaboration To Date Staff/ESCOG tour of Bishop Airport Staff/ESCOG tour of Mammoth Airport 2 sit downs between Town Staff and County Staff Discussed topics in general terms Town updates to ESCOG Jointly hosted FAA staff from both the Los Angeles and San Franscisco ADO’s Joint update to ESCOG ESCOG Board request to the Town of Mammoth Lakes and the Inyo Board of County Supervisors to create an Airport/Air Services Subcommittee.

11 Regional collaboration
Premises Town of Mammoth has experience operating a commercial airport Mammoth Airport has physical and operational constraints Inyo County has little or no experience operation a commercial airport Bishop Airport has very few physical or operational constraints Possibilities Supported by Inyo County Board of Supervisors Lease of Inyo County Facilities to Town of Mammoth Operational Contract with Town of Mammoth Joint Operating Agreement with Town of Mammoth Use of Bishop Airport for flights that for a variety of considerations can’t use Mammoth Airport

12 Regional collaboration
Inyo County – Town of Mammoth Lakes Working Group Comprised of two Board of Supervisors Members and two Town of Mammoth Lakes Council Members Group has met twice Current Areas of Discussion Myth-busting/Frequently Asked Questions Scope of Work for Air Service Economic Benefit Analysis Operating Agreements

13 QUESTIONS?


Download ppt "Project/program update"

Similar presentations


Ads by Google