Download presentation
Presentation is loading. Please wait.
1
TGaj editor report for Sponsor Ballot
Month Year doc.: IEEE yy/xxxxr0 TGaj editor report for Sponsor Ballot Date: Author(s): Jiamin Chen, Huawei Jiamin Chen, Huawei
2
Abstract This document reports the current status of IEEE-SA Sponsor Ballot on P802.11aj. Jiamin Chen, Huawei
3
Month Year doc.: IEEE yy/xxxxr0 Update for comment resolution on TGaj D7.0 (2nd Recirculation Sponsor Ballot) TGaj D7.0 passed the 2nd Recirculation Sponsor Ballot in August 2017 with the following results: In total of 15 comments were received. The corresponding comments database is 11-17/1228r0. These comments were classified into the following groups: 2 Editorial comments (ER) 2 General comments (GR) 11 Technical comments (TR) TG will resolve these CIDs on August teleconferences. Number of balloters in group: 140 Response rate: 89% Approval rate: 100% Abstain rate: 2% Jiamin Chen, Huawei John Doe, Some Company
4
Thank You! Month Year doc.: IEEE 802.11-yy/xxxxr0 Jiamin Chen, Huawei
5
Editor report for the 1st Recirculation
Month Year doc.: IEEE yy/xxxxr0 Editor report for the 1st Recirculation Sponsor Ballot Jiamin Chen, Huawei Jiamin Chen, Huawei
6
Month Year doc.: IEEE yy/xxxxr0 Update for comment resolution on TGaj D6.0 (1st Recirculaiton Sponsor Ballot) TGaj D6.0 passed the 1st Recirculation Sponsor Ballot in June 2017 with the following results: In total of 31 comments were received. The corresponding comments database is 11-17/0937r0. These comments were classified into following groups: 8 Editorial comments (ER) 3 General comments (GR) 20 Technical comments (TR) TG will resolve these CIDs on conference call and in July meeting. Number of balloters in group: 140 Response rate: 86% Approval rate: 97% Abstain rate: 2% Jiamin Chen, Huawei John Doe, Some Company
7
Editor report for Initial Sponsor Ballot
Month Year doc.: IEEE yy/xxxxr0 Editor report for Initial Sponsor Ballot Jiamin Chen, Huawei Jiamin Chen, Huawei
8
Update for comment resolution on TGaj D5.0 (Initial Sponsor Ballot)
Month Year doc.: IEEE yy/xxxxr0 Update for comment resolution on TGaj D5.0 (Initial Sponsor Ballot) TGaj D5.0 passed Initial Sponsor Ballot in April 2017 with 97% approval rate In total of 75 comments were received. The corresponding comments database is 11-17/0613r1. These comments were classified into following groups: 32 Editorial comments (ER) 11 General comments (GR) 32 Technical comments (TR) TGaj will try to resolve these CIDs on the conference call and in May meeting. Jiamin Chen, Huawei John Doe, Some Company
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.