Download presentation
Presentation is loading. Please wait.
Published byMyles Stafford Modified over 5 years ago
1
FSM Electronic Monitoring Trials National experience
Longline Electronic Monitoring (EM) planning workshop October 17, 2019 Honiara, Solomon Islands Naiten Bradley Phillip Jr.
2
Background MOU with LuenThai Fishing Venture (LTFV) in 2016
5 LTFV “frozen ULT” longliners (FSM flag) Cameras were installed in November 2016 Typically these LL stay sea for 2-3 months Average number of sets 50-60, hooks 2,000 + 3 ports in FSM (PNI, KSA, YAP)
3
EM Data Review 1st EM Data Training & Review February-March 2017 with 2 EM workstations (SVM) 5 observers were trained 2nd EM Data Review Training in October 2017 3rd SVM Trained 9 observers 100% EM data review with audit by DOS
4
Table of current data review
6
SPECIES COMPOSITION OF BILLFISH CATEGORY
7
Issues/Challenges Remote diagnostics Fishing in multiple zones
Hard drive logistics Data review time EM data review pay rates Hard drive durability
8
Future work Paired trips EM and observer plus port sampling data analysis Data audit training T3 Challenge-100% EM longline coverage by 2023 pre-implementation phase 3 Okinawa longline EM trials in FSM EEZ Cost recovery Legal framework review
9
Acknowledgements Satlink DOS TNC LTFV
10
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.