GEn-RP engineering & design Status
Robin Wines May 2019 ERR
2
Components of Gen-RP GEn polarimeter experiment requires SBS BB
CE Polarimeter PR Polarimeters HCAL and CDET May 2019 ERR
3
Gen-RP Layout Configured to run with GMn experiment BL BR BB HCAL SBS
Polarimeters May 2019 ERR
4
Gen-RP equipment- 1st setup
Field Clamp SBS PR Polarimeters PR polarimeter CE polarimeter CE Polarimeter PR polarimeter E-Hut May 2019 ERR
5
Gen-RP equipment-2nd setup
Requires removal of Field Clamp, Cu Analyzer, CH Analyzer and PR Polarimeters May 2019 ERR
6
GEn-RP equipment CE Polarimeter requires
Main frame support with alignment and motion capabilities Cu Analyzer and frame 4 GEM subframes and mounts CH Analyzer and frame PR Polarimeters require 2 main frames with supports and alignment 2 GEM subframes and mounts 2 Plastic Scintillator mount sets 2 rail sets GEMs Cu Analyzer CH Analyzer May 2019 ERR
7
Shielding Requires shielding between BB & SBS for GEMs
Plan to use existing shielding wall with addition of structure and lead to increase size to 42” Requires shielding of field from SBS magnet - Field clamp existing Field Clamp Shielding wall May 2019 ERR