Download presentation
Presentation is loading. Please wait.
Published byBella Lasseter Modified over 10 years ago
1
Bratislava 4.10.2007
2
AF Gruppen ASA • One of the largest construction companies in Norway • Ca 1800 Employees • Turnover 2006 NOK 5.194 mill. = 675 mill. Euro • Result at NOK 185,0 mill= 24 mill. Euro • Order book 700 mill. Euro
6
Organization plan AF Skandinavia AS Anlegg AF Anlegg Pålplintar AB Miljø AF Decom Skåab AB BA Gjenvinning AS Bygg AF Bygg Oslo AF Bygg Øst AF Byggfornyelse AF Brødr. Glomsrød Entreprenør AS AF Bygg Gøteborg AB Eiendom AF Eiendom Energi AF Energi & Miljøteknikk AS ”AF Mollier”
7
Vision og businessidea, AF Energi & Miljøteknikk. We will use energy on saving energy. Vision We shall be Norways leading expertise and parner within right use of energy. Businessidea
8
AF Energi & Miljøteknikk We offer 4 different qualifications too the market; • Analyse and design of systemes for efficient energy use • We work out projects and enterprises - with guarantee of investment and result • Servicing, maintenance and modification – too keep the energycost low after enterprises
9
We also offer: design, development and managenent of energycentrals and district heating based on renewable energy • We have designed an energycentral in Oslo based on heatpumps with Europs larges storage of thermal energy in rock ground. • We design a loth of centrals based on biomass energy and wood pulp • In smaller areas it is normal to distribute both heating and cooling, with heatpumps that transform the energy
10
Energy saving procects Goverment aid Time Energycost Payback-period Investment Energy analyse Investment- calculations Need Financial risk Maintenance Energycost Maintenance cost Technical optimazing Economic optimizing Physical effords Risk •Indoore climate •Electro •Heating •Ventilation •Automations •Document of guarantee Enterprise Example: •Automations •Heat recovery •Heatpumps •Energy monitoring •Economy cut •Recommended effords •Energy monitoring Goverment aid
11
Energycost Time Chart of energy / benchmark Optimizing/ Education Enterprise Control • Efforts on technical equipment • Heatrecovery • Heatpumps • Automatization Correct type of energy Reduction of energycost 10 – 40 % Continual control of energycost • Technical defects • Technics out of function • Optimizing • Mapping possibel efforts •Reduction of energycost 5 – 15 % • Energyconsumtion/Cost Energy efficient process with guarantee
12
Energy monitoring – Tecnikal draft Server GSMTelco kWh noder Ethernet Energy Manager Application Software PowerGate Excel WEB report
13
Important with energy control
14
Energy – Temperature graph
15
Vika Atrium Juli 2003, Consumtion 680.000 kWh
16
Vika Atrium Juli 2005 420.000 kWh (– 40%)
17
Romerikssenteret before optimizing
18
Romerikssenteret after optimaizing
19
Romerikssenteret
20
Thank you for your attention
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.