Presentation is loading. Please wait.

Presentation is loading. Please wait.

B2B UPDATES – RELEASE 20TH OF MAY. Sprint 3 – Committed Stories • Possible to book future campaigns with free children and free cars. For ex our year.

Similar presentations


Presentation on theme: "B2B UPDATES – RELEASE 20TH OF MAY. Sprint 3 – Committed Stories • Possible to book future campaigns with free children and free cars. For ex our year."— Presentation transcript:

1 B2B UPDATES – RELEASE 20TH OF MAY

2 Sprint 3 – Committed Stories • Possible to book future campaigns with free children and free cars. For ex our year around campaign from Trondheim to Bergen – is now possible to book with free car • PP bookings after ship has sailed(B2C+) • Possible to see PP cabin capacity • Possible to see car capacity • Enhanced flow and logic • Possible to book tailormade PP with two or more PP voyage stages

3 Enhanced flow and logic I • Many small adjustments in the B2B • 1. Show more general info on login page • 2. Hide process flow from search page • 3. Display new info box regarding upgrades in B2B, etc • 4. Rename column 3 header to "Available prices". • 5. Make “Available price” – step 3 - always visible even if no campaign for PP/RT • 5. Always show info here even if only standard rates are available. • 6. Put calendar for return trip below outbound calendar, and similar for campaigns • 7. All clickable items in price table should be blue and underlined.

4 Enhanced flow and logic II • 8. "No cabins selected" should be replaced by new text • 9. "Choose cabin by clicking on the desired prices to the left". • 10. "My selection" renamed to "Selected cabins" • 11. Change all buttons for going to the next page into a green color • 12. Change "1 BEDS" to "1 PERS" in table • Change "1 - Unspecified" to "1 bed - Unspecified", "2 beds - Unscpecified". • Legg "Book selected cabins" knapp under "My Cabins" boksen og la den være synlig hele tiden. Klikkes den før lugar er valgt skal det komme forklarende tekst til hvordan velge lugarer. • Add Continue button also on top on Excursion page

5 New login screen. 1

6 More compact search page 3 4 5 6

7 1924 - Enhanced flow and logic in the B2B GUI. Improvements of search result. 7 8, 9, 10 12 11

8 Confirmation of HON selection

9 Enhanced flow and logic in “Passenger contact” page

10 Small Fixes – Deck space & Cabins available


Download ppt "B2B UPDATES – RELEASE 20TH OF MAY. Sprint 3 – Committed Stories • Possible to book future campaigns with free children and free cars. For ex our year."

Similar presentations


Ads by Google