1
14 June 2011 Integrating biogas in the regional gas grid
2
14 June 2011 Renewable gases Renewable Biomass Gasification Anaerobic digestion Direct use Upgrading Natural gas grid Biomethane Biogas Bio Synthetic Gas Dedicated grid Cleaning
3
14 June 2011 1 2 3 Three current feed-in projects 1.De Marke, Hengelo (Gld) 2.Schoteroog, Haarlem 3.HVC, Middenmeer
4
14 June 2011 De Marke, Hengelo (Gld) Specifications Parties involved:Wageningen UR Livestock Research, GreenChoice Source:Manure (cows) Upgrading:Gas washing Max. flow:14 m 3 /hr Location:Hengelo (Gld) Gas pressure:100 mbar
5
14 June 2011 Schoteroog, Haarlem Specifications Parties involved:Essent, Gas Treatment Services, NV Afvalzorg, Hoogheemraadschap Rijnland en Gemeente Haarlem Source:Landfill and waste water treatment plant Upgrading :GPP® - cryogene technique Max. flow:300 m 3 /hr – 1000 m 3 /hr Location:Haarlem Gas pressure:4 bar
6
14 June 2011 HVC, Middenmeer Specifications Parties involved:HVC, DHV Source:Compostable waste Upgrading:Gas washing Max. flow:1000 m 3 /hr Location:Middenmeer Gas pressure:8 bar
7
14 June 2011 Pattern of gas demand Example for an 8 bar grid
8
14 June 2011 Optimal location choice Location & opportunities –Feed in location: Highway or Dirt Road –Optimal solution; costs –Central Upgrade Unit –Injection 40 Bar? –Demand vs. Production
9
14 June 2011 Feed-in station Monitoring: Chemical composition Pressure Volume flow Including: Filter Safety valves Data communication
10
14 June 2011 Biogas in the natural gas grid
11
14 June 2011 Biogas grids
12