1 DCS Planning 17.6.02 L.Jirdén
2
2 DCS Planning 20020304050607 FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE SUB-DET CONTR. INSTALL DETECTOR DCS INSTALL DCS INFRASTRUCTURE TEST WITH DETECTOR EQUIPMENT
3
3 TPC DCS Planning 20020304050607 FINAL INST COM- MISS OPOP DET READOUT Cool:PVSS conn log config, alarms, FSM, DET, DAQ HV: PVSS conn log config, alarms, FSM, DET, DAQ LV: PVSS conn log config, alarms, FSM, DET, DAQ FEE: PVSS conn log config, alarms, FSM, DET, DAQ TSCREEN: PVSS conn log config, alarms, FSM, DET, DAQ LASER: urd PVSS conn log config, alarms, FSM, DET, DAQ FIELDCAGE HV: ROD Cool: ROD Curr: TESTS: lab sector pre-installation
4
4 Conclusion u DCS to be ready for each detector in 3 years (mid 05) u A realistic planning of these 3 years is essential u Detector tests to be used as milestones for the DCS planning u Intermediate steps to be detailed for each sub-system u Planning to be added to the URD
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.