Download presentation
Presentation is loading. Please wait.
1
THE SEASONS AT VILLAGE GREEN
2
CITY OF BRADENTON
3
AERIAL
4
SITE AERIAL
5
EXISTING CONDITIONS EXISTING POWER LINE
6
EXISTING POWER LINE
7
EXISTING CONDITIONS EXISTING DITCH
8
EXISTING DITCH
9
EXISTING CONDITIONS
10
SWF POWER LINE SWF CONVEYANCE SWF SWF SWF CONVEYANCE SWF SWF SWF
11
15’ EMERGENCY ACCESS EASEMENT
SWF SWF POWER LINE CONVEYANCE SWF SWF SWF CONVEYANCE SWF SWF SWF 15’ EMERGENCY ACCESS EASEMENT
12
15’ EMERGENCY ACCESS EASEMENT
SWF SWF CONVEYANCE SWF SWF SWF CONVEYANCE SWF SWF SWF 15’ EMERGENCY ACCESS EASEMENT
13
15’ EMERGENCY ACCESS EASEMENT
SWF SWF CONVEYANCE WALKING TRAIL SWF SWF SWF RECREATION AREA CONVEYANCE SWF SWF SWF 15’ EMERGENCY ACCESS EASEMENT
14
15’ EMERGENCY ACCESS EASEMENT
SWF SWF CONVEYANCE WALKING TRAIL 5’ SIDEWALK SWF SWF SWF RECREATION AREA CONVEYANCE SWF SWF SWF 15’ EMERGENCY ACCESS EASEMENT
15
BUFFER EXHIBIT
16
RECREATION AREA
17
PROJECT SUMMARY Maintenance free community
Member of Village Green Master Association Private gated entrance/ Private streets Density of 3.37 homes per acre 142 – one story single family detached homes 5 models, 5 elevations for each model = 25 possibilities Typical home 1,800 SF to 2,500 SF under roof. Same as Village Green 25’ setback from edge of pavement 35’ minimum setback and 80’ typical setback from surrounding properties
18
PROJECT SUMMARY Minimum 12’ between exterior walls
Planned community with Central Focal Point 466 New trees to be planted throughout the development Consistent with Comprehensive Plan Compatible with Surrounding Development Asset for the Village Green Community
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.