Download presentation
Presentation is loading. Please wait.
Published byTori Turnley Modified over 10 years ago
1
Markus Heene, DWD markus.heene@dwd.de
GISC DWD Markus Heene, DWD
2
GISC DWD - Timeline 05/2010 First preoperational GISC in WIS
09/2010 Endorsement ET-GDDP 11/2010 CBS Recommendation 05/2011 Designation from WMO CG XVI 09/2011 Operations GISC DWD
3
GISC DWD - Services Discover Access and Retrieval
Flexible Subscription Services Time triggered Event triggered Metadata Editor Hosting WIS Centre GISC DWD
4
Contributions to WIS DWD participates several ETs, ICG, …
Released Metadata catalogue performance study to community Geonetwork improvements Shared results of DAR Metadata analysis with WIS community Active member of jOAI community DAR Metadata Generator Released SRU2JDBC in co-operation with WMO as Open Source AFD (Automatic File Distributor) flexible Open Source distribution software Contribute expert for WIS Jump Start Offer Support WMO WIS Branch with staff GISC DWD
5
GISC DWD Connected DCPC ECMWF EUMETSAT Arctic Data Centre (met.no)
DKRZ AWI DLR ESA (Italy) … GISC DWD
6
Workflow – Connect DCPC – Metadata Exchange
GISC DWD
7
Workflow- Details Step 1 Step 2
Kick-off: Workshop, Telephone Conference, Conversation Exchange Details: Scope of DCPC, WIS, Roles and Responsibility, … GISC provides WIS documentation DCPC provides ISO conform DAR Metadata Step 2 Check DAR Metadata GISC validates Metadata record (ISO 19139) GISC imports Metadata record Granularity: 100 or Metadata records ? Necessary Elements: fileIdentifier and dateStamp (required for update but not ISO mandatory) Check Online Resource Check WMO recommendations GISC DWD
8
Workflow- Details Step 3: Step 4:
GISC explains implemented procedures for Metadata exchange OAI – standard for GISC to GISC Metadata exchange DCPC provides OAI Server Address and OAI Set Name GISC configures harvesting procedure FTP – optional exchange procedure for DCPC or NC Agree on push or pull – exchange server and account details Agree on delete procedure Step 4: Test exchange procedure – functional tests Use Cases: Create, Update, Delete Metadata Record OAI Incremental Harvesting – time attribute Delete Operation – is optional according to OAI Spec FTP Test agreed delete Procedure GISC DWD
9
Workflow- Details Step 5 Step 6 Operation test-phase
Integration of DCPC into OAI test bed Bulk tests Check robustness and reliability Step 6 Operation phase if all tests passed and communication established GISC DWD
10
Q&A GISC DWD
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.