1 Foundation has been tarred to grade line

2 Bluewater Plumbing has arrived for in-floor heat

3 Peter changing light bulbs on the pole

4 Former Parkhill PUC utility truck

5 Installing the top plates

6 Basement bathroom roughed in with pump pit

7 Solid Big ‘O’ for downspouts

8 Stone covering the footing tile, laying the downspout tile

9 Joins to drain to the east slope

10 Upright Big ‘O’ is for a downspout

11 Don and J.J. creating a drain area at the garage door

12 Backfill for the foundation - gravel

13 Don Heard backfilling the foundation

14 Replacement windows arrive under black sky

15 Replacement windows stacked and ready to install

16 Insulation blanket to go under the radiant floor heating

17 Organized chaos

18 Spreading the backfill along the foundation wall

19 Laying out the wire mesh for the concrete floor

20 We’ve started with the open web floor joists

21 Installing the floor heating tubes

22 Wired to the mesh in a grid

23 Moving the concrete slab – carefully! Tipping as he moves.

24 Unload it at the back of the barn

25 Layout is completed

26 I will have to take measurements for partitions

27 The heater will be located in the old basement