Presentation is loading. Please wait.

Presentation is loading. Please wait.

Park School Modernization Summer 2012. New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.

Similar presentations


Presentation on theme: "Park School Modernization Summer 2012. New paint, new glass, new landscape, new flagpole, and new paving Before After Entry."— Presentation transcript:

1 Park School Modernization Summer 2012

2 New paint, new glass, new landscape, new flagpole, and new paving Before After Entry

3 New retaining wall, fence, and walkway around tree made of pavers Before After Sidewalk dead ends into tree

4 New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting Before After Southern entrance into school

5 New window glazing, water fountain, paint, asphalt, lighting and playground striping Before After Back of school

6 New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways Before After Old boys restroom

7 New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway Before After Planter

8 New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway Before After Campus

9 New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus

10 New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus

11 New Exit stairs, paint, and playground striping Before After Exit stairs

12 New exit stairs and playground striping Before After Exit stairs

13 New siding on Annex Building Before After Old siding on Annex Building

14 New ADA compliant ramp and retaining wall Before After Ramp

15 New entry store front, paint and railing Before After Entry

16 New Paint Before After Ceiling at front entry

17 New casework and paint Before After Resource room

18 New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater Before After Lower level classroom

19 New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards Before After Lower level classroom

20 Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler Before After Hallway

21 Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint Before After Hallway

22 New carpet, paint, door, counter, pin-up panels Before After Administrative offices

23 New wall creating nurse station, new paint, flooring, doors Before After Administrative Office

24 Remove wall, new casework, new sink Before After Staff work room

25 New window glazing where windows failed Before After Typical Classroom

26 New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator Before After Typical classroom

27 New storefront exit system, larger landing with abrasive action carpet new railing Before After Exit stairs

28 All new fixtures and finishes Before After Typical upper restroom


Download ppt "Park School Modernization Summer 2012. New paint, new glass, new landscape, new flagpole, and new paving Before After Entry."

Similar presentations


Ads by Google