SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB.

Similar presentations


Presentation on theme: "SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB."— Presentation transcript:

1 SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB ARD, December 2010 Carsten Hast Test Facilities Department

2 SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department2 ESA ESB & NLCTA FACET ASTA

3 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department3 Test Facilities Cast of Characters

4 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department4 ARD Test Facilities’ Goals High Energy Physics –Support Research for Linear Collider High and Ultra High Gradients Plasma Acceleration Direct Laser Acceleration Machine Detector Interface Studies –Detector Development LC Detectors B-Factories others Photon Science –Gun Development New Materials New Designs Different Frequencies –Novel Seeding Techniques for FELs and other FEL Fundamentals Echo Enabled Harmonic Generation Emittance exchange THz Radiation Coherent Optical Transition Radiation etc.

5 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department5 Accelerator Structure Test Area (ASTA) Stephen will talk about that in a little while

6 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department6 End Station Test Beam (ESTB) at ESA World’s only high-energy primary electron beam for Test Beams Kick 13.6 GeV LCLS beam to ESA 2 - 6 x 10 9 e - /pulse @ 5 Hz

7 Kicker Magnets and other Hardware 4 new kicker magnets for BSY including power supplies and modulators and vacuum chambers are designed and components are being ordered Build new PPS system and install new beam dump ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department7

8 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department8 ESA Experimental Area Beam

9 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department9 ESA Infrastructure Available Instrumentation Trigger counters Halo veto counters High resolution beam hodoscope Particle ID (Cerenkov, TOF, shower counter) Small, high field solenoid sturdy support table with remote movers Cranes 15 and 50-ton cranes available

10 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department10 18 feet Wakefield boxWire ScannersRF BPMs T-487: long. bunch profile “IP BPMs” T-488 Ceramic gap for EMI studies BPM energy spectrometer (T-474/491) Synch Stripe energy spectrometer (T-475) Collimator design, wakefields (T-480) Bunch length diagnostics (T-487) Smith-Purcell Radiation IP BPMs—background studies (T-488) LCLS beam to ESA (T490) Linac BPM prototypes EMI (electro-magnetic interference) Irradiation Experiments Dipoles + Wiggler ESA Primary Beam Equipment Layout

11 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department11 ESTB Detector Test Area Beam spot:  < 1mm

12 Enlisted Help! Mauro joined the ESTB team and will lead the effort to make ESA “usable” again –Need to reinstall BPMs which are on loan to Berkley –Complete the beam line –Install a dump –Improve the experimental infrastructure –Clean Up!!!!!!!!!!! ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department12

13 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department13 ESTB Status New BSY kicker magnets, power supply and vacuum chambers –All items are in the design and purchasing stage (based on existing hardware) –Will be installed during the down March/April 2011 New small beam dump for ESA –Design is clear –Radiation protection calculations are ongoing –Will be installed early 2011 New Personnel Protection System (PPS) –Design has started and implementation plan is under development –Scheduled to be done by June 2011 There will be a User Workshop at SLAC Thursday, March 17 2011 in conjunction with 2011 Linear Collider Workshop of the Americas (ALCPG11), University of Oregon in Eugene, March 19-23, 2011 First beam summer 2011

14 SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department14 End Station B

15 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department15 ESB NLCTA TTF Couplers Marx Modulator X-Band Plasma Switches L-Band Laser E-163 DLA S-Band Gun Echo-7RF Testing XBTA Big Pipe 2-Pack

16 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department16 Big Pipe (aka: C^2 pipe dreams) Remember: Chris A. describing the Klystron Cluster Concept for ILC?

17 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department17 Big Pipe (on steroids…) B-Target Room

18 SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department18 End Station B

19 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department19 NLCTA Plans Improve NLCTA –Control System, more uniform DAQ –Better beam diagnostics –Fix Phase jitter (between klystrons and lasers) –Install another RegenAmplifier in laser room for more flexibility –And many more Ongoing Program –Echo Echo 7-15 Narrow-band beatwave THz emission Studies COTR properties and micro-bunching instabilities –Continue E-163 –Continue X-Band RF tests New Installations –Upgrade spectrometer –Install transverse cavities for increased slice energy spread Redo EEHG Emittance Exchange with transverse cavities New X-Band Test Area –structure testing –X-Band gun with100 MeV linac

20 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department20 X-Band Test Area

21 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department21 Coherent Optical Transition Radiation Gerard Agostino Diktys

22 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department22 Coherent Optical Transition Radiation Goal of the experiment: Reconstruct transverse distribution of micro-bunching in amplitude and phase Far Field only Far Field and Near Field simultaneously Phase can be found with a phase retrieval iterative algorithm We have invited Diktys to give a seminar about that next year

23 Preliminary Results Decent signal from microbunching instability but few photons survive after bandpass filter Unexpected Interference pattern in the far field zone Pattern appears at two locations along NLCTA Etalon effect in the exit vacuum window? Near future plans: COTR imaging and ECHO experiments are compatible More data will be gathered during ECHO runs with motorized camera lenses ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department23

24 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department24 FACET Update

25 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department25 FACET User Area

26 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department26 FACET User Trailer User trailer is in purchasing, had job walk this morning and are waiting for bids

27 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department27 SAREC Review Process SLAC Accelerator Research Experimental program Committee –evaluate the merit of proposed R&D in SLAC’s experimental accelerator research facilities for advancing world-class accelerator science or accelerator technology –evaluate the feasibility of proposed R&D in SLAC’s acc. res. facilities –review the progress of existing R&D in SLAC’s acc. res. facilities 1 st Meeting: January 10 th to 12 th 2011 Members: Uwe Bergmann (SLAC), Gerry Dugan (Cornell), Eric Esarey (LBL), Jie Gao (IHEP), Kathy Harkay (ANL), Carsten Hast (SLAC, Scientific Secretary), Sergei Nagaitsev (FNAL), Andrei Seryi (Chair, John Adams Institute) Vitaly Yakimenko (BNL), Kaoru Yokoya (KEK) Frank Zimmermann (CERN) Sarec was a Vulcan astrophysicist and elder who served as the ambassador to Earth during the 2240s and 2250s. He was married to a Human woman, Amanda Grayson, and was the father of Spock and Sybok.

28 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department28 FACET Proposals Review SAREC Agenda: Monday 10 th Morning: Tour of FACET and ESB Afternoon: Welcome, ASTA,NLCTA and FACET status Tuesday 11 th Presentation of FACET proposals Wednesday 12 th (closed) Q/A for each proposal Discussion Briefing of ARD management

29 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department29 FACET Proposals FACET Proposals: –Ultrafast Processes in Magnetic Solids (Durr, SLAC) –Plasma Wakefield Acceleration (Hogan, Joshi, Muggli, SOCAL) –Opical Diffraction Radiation Beam-size Monitor (Lumpkin, FNAL) –Metallic Structures Periodic Structures (Tantawi, SLAC) –Wakefield Acceleration in Dielectric Structures (Rosenzweig, Travish, Hogan, Muggli, SOCAL) –Bunch Time Profile Measurement using Smith-Purcell Radiation (Reichold, OXFORD) –Measurements for the CLIC Study (Schulte, CERN) –PASER (Schachter, TECHNION) –HG Dielectric Wakefield Measurments (Kanareykin, EUCLID TECHLABS) –THz Radiation (Frisch, SLAC)

30 ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department30 FACET Schedule Construction finished in May 2011 Linac down ends May 15 th LCLS User run starts June 2 nd Bring up Sectors 0 to 20 late May Start beam operation of S 0 to 20 and damping ring during June User Assisted Commissioning and Early Science July and August 2010 FACET project will install new chicane in S10 during September to November CD4 review in December 2011 First User Run mid January 2012 to end of March 2012

31 SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department31 Summary We do a lot of stuff ASTA ESA ESB FACET User Area NLCTA Plus a little bit of LCLS and ATF II Want to help? –NLCTA upgrades and future run plans need a lot of ARD support Let’s talk how YOU can help!!!!!!!!


Download ppt "SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB."