Presentation is loading. Please wait.

Presentation is loading. Please wait.

MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 1 Measurements of voltage over main dipole magnet B30R7 Mateusz Bednarek & Jaromir Ludwin on behalf of.

Similar presentations


Presentation on theme: "MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 1 Measurements of voltage over main dipole magnet B30R7 Mateusz Bednarek & Jaromir Ludwin on behalf of."— Presentation transcript:

1 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 1 Measurements of voltage over main dipole magnet B30R7 Mateusz Bednarek & Jaromir Ludwin on behalf of the ELQA team AT/MEI-FP 18 June 2008

2 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 2 Checking balance between two apertures

3 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 3 Ua + Ub, Opening EE switch at 3 kA

4 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 4 Checking the balance between coils within each aperture

5 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 5 U1 + U2 and U3 + U4 at 5 kA – no unbalance

6 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 6 Comparison between measurements Sum Ua + Ub visible on first plot can be calculated from voltages U1, U2, U3, U4: Ua + Ub = U1 – U2 + U4 – U3

7 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 7 Ua + Ub calculated from U1, U2, U3, U4

8 MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 8 Ua + Ub on C29R7, opening switches at 5 kA


Download ppt "MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 1 Measurements of voltage over main dipole magnet B30R7 Mateusz Bednarek & Jaromir Ludwin on behalf of."

Similar presentations


Ads by Google