Download presentation
Presentation is loading. Please wait.
Published byFrancesca Sorrell Modified over 10 years ago
1
APT PRO–M Economic Based Maintenance Available from: Asset Performance Technologies, Inc. Corrales, New Mexico www.assetperformanceinc.com Use Mouse Click or Space Bar to advance slides. Press “ESC” key at any time to end show.
2
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 2 How PRO-M Can Optimize Your PM Program Plant PM Software EAM/CMMS Interface Export Equipment Data tag #, description, etc. Import to PRO-M automatic or manual input Set Equipment’s: -Functional importance -Operational conditions -Economic importance PRO-M Optimizes the PM Program For Cost and Reliability (at the click of a button) PRO-M Recommends a PM Program Old PM Program Improved PM Program
3
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 3 Enter Your Plant and User Names Here
4
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 4 Select Your Component Type from this Pull-down List
5
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 5 PRO-M Recommends a PM Program (Designed by Equipment Experts) Enter Your Current PM Program Intervals Here (in this case, RTF is assumed) Or Click Here to Optimize the Recommended Program for Your Plant’s Conditions
6
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 6 RTF Costs (mostly Production Losses) Are Much Higher Than Recommended Program Costs! PRO-M Compares a Baseline Case (Recommended Program) and a Custom Case (RTF)
7
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 7 This Graphic details PRO-M’s Cost Model and Defines the Terms Used in the Previous Slide
8
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 8 RTF Failure Rate is 9X Higher Than Recommended Program!
9
Copyright © 2006 Asset Performance Technologies, Inc. All rights reserved. APT 9 PRO-M’s FMEA Data Includes Degradation Influences and Time Codes PM Effectiveness is also Included Only PRO-M has these Unique Data, allowing you to Know the Reliability and Economic Benefit of your PM Program at the Push of a Button!
10
APT With PRO-M, true economic based maintenance is available to you at the click of a button. The real question is, “Can you afford not to use PRO-M for your maintenance needs?”
11
APT ASK ABOUT OUR WEB DEMO www.assetperformanceinc.com Contact: Mark Benak VP, Business Development mbenak@assetperformanceinc.com +1 (505) 350-6327
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.