MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team
2
Overview MT Continuum overview Application to other communities Project status Lessons learned for other NETC communities
3
MT Continuum Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE- conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: – SSP - Requirements Owners – Contractor team – ILT dvlp, self-paced input, SMEs – NAWCTSD / AIM team - CPM/LO Module support – LSI, Inc. - ISD and self-paced content design/development – CFS – CM/QA agent for SSP
4
Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections and design of self-paced lessons/sections Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content Bi-directional interface between LO Module and LSI Venus.net CBT toolset for self-paced development/maint.
5
Project Status Plan, Analyze and Design Completed – JDTA – Establishment of initial 3 major projects – Revised 9-project structure Approval of learning objectives Ongoing development of ISD considerations elements as part of script-storyboard effort Development (production) Phase underway 15 May 11 – 9 projects exported from CPM to LO Module for production development in AIM I Rel 5.0 on fedsun – SWS AIM I instance to transition to NETPDTC hosting by 1 Oct 11
6
Lessons Learned for Other NETC Communities Completion of supporting documentation in Design Phase is crucial – (IMDP, ASDD, process documents) Establish standard for estimating TTT in Design Phase Establish change request process in Design Phase Complete Development IMS/POA&M in Design Phase – better activity duration estimates for process steps.
7
Questions?
8
Backup Slides
9
Issues/Concerns “End to end” surveillance/maintenance test on TLO/ELO in process to: – confirm existing change impact identification functionality in CPM and LO Module – identify near-term updates – refine longer-term enhancements Testing begun by Mark Campbell and Mike Lueken (LMMS) w/ favorable results Identified critical issues addressed as part of AIM I Rel 5.0 Further testing surveillance testing on LDC is still required and ongoing with Rel 5.0 by Jamie Swaim (CSF) Team continues to refine versioning business rules/process
10
10 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together