Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Proposed Head Office Dubai, UAE LEED Platinum Building Presented by Mario Seneviratne.

Similar presentations


Presentation on theme: "Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Proposed Head Office Dubai, UAE LEED Platinum Building Presented by Mario Seneviratne."— Presentation transcript:

1 Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Proposed Head Office Dubai, UAE LEED Platinum Building Presented by Mario Seneviratne On Behalf of Paul Watson

2 Case Study – LEED Platinum Building – May 2008 AL HABTOOR LEIGHTON GROUP

3 Case Study – LEED Platinum Building – May 2008 78

4 Case Study – LEED Platinum Building – May 2008 What is LEED… Building Design Tool Sets Building Performance Criteria Benchmark of Design, Construction and Operation of High Performance Green Buildings Whole Building Approach to Sustainability Targets Conserving Energy and Natural Resources, in turn Conserving the Environment and the Ecology Makes Business Sense

5 Case Study – LEED Platinum Building – May 2008 Triple Bottom Line Objective; AL HABTOOR LEIGHTON GROUP Environmental Employees Economic

6 Case Study – LEED Platinum Building – May 2008 LEED PLATINUM 68

7 Case Study – LEED Platinum Building – May 2008 The difference between Participating in and being Commitment to Green Buildings Technology in the UAE is the difference between; 39 and 52 Al Habtoor Leighton Group is committed to actively delivering the Built Environment in the UAE that embeds worlds best practice of Environmentally Sustainable Design (ESD) into its projects AL HABTOOR LEIGHTON GROUP

8 Case Study – LEED Platinum Building – May 2008 Total integration and commitment prior to Design Commencement by; Owner Developer Consultants team LEED consultant Contractor Tennant and its employee representative Facilities Manager AL HABTOOR LEIGHTON GROUP

9 Case Study – LEED Platinum Building – May 2008 Cost Consultant Architect Contractors Owner User Groups Engineer(s) LEED an Integrated Design Process LEED Consultant

10 Case Study – LEED Platinum Building – May 2008 Division of Documentation Effort Spec Plan Letter Narrative Drawing Calculation Product Info

11 Case Study – LEED Platinum Building – May 2008 Discuss in general terms the macro issues that must be embedded into the project design to ensure that the built environment gives LEED Platinum rating. Eg – windows coverage MEP – Recycled water systems – Energy usage and conservation – Method of air conditioning – bottom up Façade treatment Fly Ash in Cement Ability to recycle materials during construction and also operations AL HABTOOR LEIGHTON GROUP

12 Case Study – LEED Platinum Building – May 2008 The Al Habtoor Leighton Group seeks to become the leading builder of Green Technology Projects in the UAE by gathering worlds best practice through its international network and delivering it domestically. It’ s commitment to a greener world and a healthier work environment is to build its own LEED Platinum Headquarters building in Dubai for completion in 2009 AL HABTOOR LEIGHTON GROUP

13 Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Group is offering a “one stop fully integrated turn key delivery system” for Green Technology in the Built Environment in the UAE

14 Case Study – LEED Platinum Building – May 2008 ENERGY EFFICIENCY TARGETS

15 Case Study – LEED Platinum Building – May 2008 WATER REDUCTION TARGETS

16 Case Study – LEED Platinum Building – May 2008 The Green Path LEED Design Charrette Goal Setting and Design Direction Participate in 2 - 3 Design Workshops Modeling USGBC Submission (s ) Construction and Completion Final Submission to USGBC LEED Platinum Award

17 Case Study – LEED Platinum Building – May 2008 AL HABTOOR LEIGHTON GROUP

18 Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Proposed Head Office Dubai, UAE LEED Platinum Building Presented by Mario Seneviratne On Behalf of Paul Watson