WECC VGS PWG P-3 Transmission Capacity and Adequacy Matt Muldoon Mar 31, 2011 1
2
Personal Opinion Cannot Prejudge any Issue Cannot Restrict any Commission 2
3
What are we learning re: Limitations of Existing Transmission Infrastructure General study findings may not apply to specific circumstances ▪ Many directly related issues require automation which may not be present (e.g., dynamic transfer, intra-hour scheduling) ▪ Local capabilities or technology may place limits on available benefits 3
4
Automation – RAS “Remedial Action Schemes” Automatic Generation Control Other System Automation 4
5
Age of T System & Supporting IT Amount of Long Lead Resources Ex: Hydro Flows between Dams Ability to Translate Upgrades into Programs that Deliver Expected Benefits 5
6
What Investment in Automation Enables what Increased Capabilities with Existing Grid Facilities? Dynamic Transfer Intra-Hour Scheduling Better Use of Non-Contiguous Resources Other System Flexibilities 6
7
Better Interim Grid Utilization – NOT Eliminated Transmission Build More Workable Seams Issues – NOT Elimination of Seams Issues Ability to Integrate More VER More Reliably – Not Necessarily Sooner Incremental Rather than Transformational Change 7
8
Usual IT and Automation Risks Regulatory risk of recovering costs Difficult to Isolate Just IT Needed Difficult to Integrate New Software Fear of Cascading Upgrades A For a larger BA, roughly $50 Million is needed to Better Utilize T Lines with a Replacement Cost of $1B+ Ea.. 8
9
Characterize Linkages between: Automation and System Capabilities BA Characteristics and Benefit Limiters Type of Automation and Overlap of Enabled or Hindered (Sub) Regional Initiatives 9