Download presentation
Presentation is loading. Please wait.
Published byBrynn Fishwick Modified over 10 years ago
1
Operativni program Slovenija– Avstrija 2007–2014/Operationell Programm Slowenien-Osterreich 2007-2014 Fifth working meeting of the MURMAN project in Fehring, Austria, on 11 October 2012 MURMAN project, Fehring, Austria, 11 October 2012 1
2
UVOD / INTRODUCTION WP1, WP 4 – responsible partner WP 2 and WP 3 – working partner Activities planed /Work done 1st period: 01.07.2011 – 2nd period: 01.01.2012 – 30.06.2012 Activities planed the 3rd reporting period MURMAN project, Fehring, Austria, 11 October 2012 2
3
NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP1 Coordination of project partners regarding project handling Coordination of interaction between project partners Synoptic work schedule (23.01.2012) MURMAN project, Fehring, Austria, 11 October 2012 3
4
IZVEDENO DELO / WORK DONE Synoptic work schedule (23.01.2012) meeting minutes MURMAN project, Fehring, Austria, 11 October 2012 4
5
REZULTATI / RESULTS Meeting minutes Project – arhive MURMAN project, Fehring, Austria, 11 October 2012 5
6
RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP Main objective – cooperation between partners Specific topics WP2_Development of database for collection and management of groundwater measurement/quality data WP4_Web-page development/Data visualisation MURMAN project, Fehring, Austria, 11 October 2012 6
7
ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP Synoptic work schedule (23.01.2012) Date of the next meeting 2 W March 2013 (proposal) Apaško polje - Zgornje Konjišče Minutes corrective action draft version prepared in 1 W partner answer – 2 W minutes from past period can not be corrected MURMAN project, Fehring, Austria, 11 October 2012 7
8
NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP4 Development of a Web-based information system Workshops and excursions Preparation of different brochures and other information materials Organisation of a scientific conference Creation of a platform for all water suppliers in the project region MURMAN project, Fehring, Austria, 11 October 2012 8
9
IZVEDENO DELO / WORK DONE Development of a Web-based information system visualisation of the Austrian – Slovenian web site (some more details in pm section) Workshops and excursions Synoptic work schedule Dan evropskega sodelovanja/Der Tag der Europäischen Zusammenarbeit MURMAN project, Fehring, Austria, 11 October 2012 9
10
IZVEDENO DELO / WORK DONE Organisation of a scientific conference starting activities (some more details in pm section) Creation of a platform for all water suppliers in the project region starting activities (some more details in pm section) MURMAN project, Fehring, Austria, 11 October 2012 10
11
REZULTATI / RESULTS Development of a Web-based information system Web site activity and use Workshops and excursions minutes Dan evropskega sodelovanja/Der Tag der Europäischen Zusammenarbeit- minutes, photos, film MURMAN project, Fehring, Austria, 11 October 2012 11
12
REZULTATI / RESULTS Organisation of a scientific conference proposal for scientific and organisational Committee Creation of a platform for all water suppliers in the project region Problemska konferenca komunalnega gospodarstva/Problem conference of the public utility sector MURMAN project, Fehring, Austria, 11 October 2012 12
13
RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP Main objective dissemination cooperation with other partners Specific topics WP2_Development of database for collection and management of groundwater measurement/quality data MURMAN project, Fehring, Austria, 11 October 2012 13
14
ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP Organisation of a scientific conference proposal 1/4 2014 Creation of a platform for all water suppliers in the project region proposal ¼ 2013 MURMAN project, Fehring, Austria, 11 October 2012 14
15
NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP2 - cooperation Development and operation of virtual database Groundwater monitoring and assessments Identification of individual groups of contaminant causes and the individual influence of contaminants on the ground water Risk assessment of freshwater supply systems Apaškega polja MURMAN project, Fehring, Austria, 11 October 2012 15
16
IZVEDENO DELO / WORK DONE Development and operation of virtual database statistically evaluated data Slo ground water: 2000-2011 Slo drinking water: 2004-2011 Slo river Mura: 2009 - 2011 MURMAN project, Fehring, Austria, 11 October 2012 16
17
IZVEDENO DELO / WORK DONE Identification of individual groups of contaminant NO3 atrazine, metabolite Risk assessment of freshwater supply systems Apaškega polja health aspects of the higher value of NO3 in drinking water MURMAN project, Fehring, Austria, 11 October 2012 17
18
REZULTATI / RESULTS Development and operation of virtual database Identification of individual groups of contaminant date prepared to use them in data base date prepared for visualisation MURMAN project, Fehring, Austria, 11 October 2012 18
19
RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP WP2_Development of database for collection and management of groundwater measurement/quality data Styria, IEI, GSO MURMAN project, Fehring, Austria, 11 October 2012 19
20
ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP Synoptic work schedule On-line visualisation of the nitrate distribution chart of the Murtal 2002-2010 and time development of the nitrate concentration - 12/2012 MURMAN project, Fehring, Austria, 11 October 2012 20