Presentation is loading. Please wait.

Presentation is loading. Please wait.

Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair.

Similar presentations


Presentation on theme: "Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair."— Presentation transcript:

1 Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair TT on RMDCN

2 2 RA VI workshop on WIS implementation, Sofia, 1-3 November 2011 Session 3 – WIS telecommunication RMDCN Satellite communication & multicast Discussion

3 RMTN configuration - The majority of the links are through the RMDCN - The number of additional circuits on bilateral agreement has increased – Easy to implement additional links through the Internet and cloud network services - A few Internet based circuits - The number of non-operational circuits is 7 - Remarkable improvement in circuit speed - Satellite broadcasting systems are available to complement to the GTS - The majority of the links are through the RMDCN - The number of additional circuits on bilateral agreement has increased – Easy to implement additional links through the Internet and cloud network services - A few Internet based circuits - The number of non-operational circuits is 7 - Remarkable improvement in circuit speed - Satellite broadcasting systems are available to complement to the GTS

4 4 RA VI workshop on WIS implementation, Sofia, 1-3 November 2011 RMDCN Configuration 49 sites are connected –45 National meteorological services 35 from RA-VI –ECMWF –EUMETSAT (2 sites) –1 disaster recovery site for The Netherlands Israel connected to the RMDCN (June 2011 - 1 Mbps Mission Critical) South Africa is being connected (2 Mbps Mission Critical) Very reliable

5 RMDCN From 64 kbps to 8 Mbps 2 access circuits or 1 circuit + backup Some RA-VI countries have not joined RMDCN, mainly due to cost concerns. –This situation is not likely to change in a near future 2 nd WMO Task Team on the RMDCN 28-29 June 2011 at ECMWF, Reading –Topics related to the requirements for the next generation of the RMDCN were discussed RA-VI Workshop on next generation RMDCN in spring 2012

6 6 RA VI workshop on WIS implementation, Sofia, 1-3 November 2011 EUMETCast Overview DVB-S file based satellite dissemination system >2900 Users in RA-VI Tellicast multicast reception software using off the shelf PC and antenna systems RETIM and DWDSAT as third party dissemination services for RA-VI on EUMETCast EOPortal at EUMETSAT for user registration and data discovery

7 7 RA VI workshop on WIS implementation, Sofia, 1-3 November 2011 Internet Primary link for some NMHS –Through VPN connexions To get additional bandwidth at affordable costs –ECMWF products Backup method for RMDCN sites –Operational DMVPN-based solution managed by ECMWF Access method to the MPLS cloud

8 8 RA VI workshop on WIS implementation, Sofia, 1-3 November 2011 Thanks for your attention …


Download ppt "Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair."

Similar presentations


Ads by Google