Download presentation
Presentation is loading. Please wait.
Published byJavier Eastlick Modified over 10 years ago
1
RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1
2
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-IASI
3
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-IASI Design: Decentralised processing. Channel selection and data compression using Principal Component Scores to reduce data volume. Processor: AAPP (v7.3) and OPS-LRS (v6.0p12) as delivered by NWP SAF. Distribution via EUMETCast Ku-Band and GTS. Satellites: Metop-A (Metop-B, Metop-C). Number of stations: 4 (more planned for Metop-B). Products, formats: One Level 1c product per pass: –calibrated and navigated IASI observations, –combined product containing both Principal Component scores and 366 original IASI Channels, –cloud/scene analysis information, –BUFR format. Timeliness: 30 minutes (HRPT). 60 minutes (FDES).
4
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-IASI (2/2) Number of Users on EUMETCast: > 100 registered Users. Number of products per day: ~ 25 files, corresponding to 500 MB. System evolutions in the near future: GTS dissemination to start in November 2012. Metop-B. Product quality monitoring (under development): NWP-SAF product monitoring (comparison with global data and local products, warning messages, etc.). Details to be agreed. Statistics + inter-comparisons at EUMETSAT.
5
RARS Implementation Group – Sixth meeting Exeter - 2012 Product Processing Slide: 5 OPS-LRS AAPP L1C IASI GTS EUMETCast IASI L1 BUFR (PC scores and 366 channels) L0 IASI AAPP L0 AVHRR L1B AVHRR
6
RARS Implementation Group – Sixth meeting Exeter - 2012 Daily Data Volume per Service (EUMETCast Ku-Band - October 2012) Slide: 6 ServiceNumber of stations Number of satellites Total number of passes Daily volume (MB) EARS-ATOVS156420625 EARS-AVHRR7228 (630 segments)1400 EARS-ASCAT713776 EARS-IASI4125500 EARS-NWC7228 (630 segments)800
7
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-NPP
8
RARS Implementation Group – Sixth meeting Exeter - 2012 Direct Readout Reception Supporting NOAA POES, Metop, NPP/JPSS, FY3 Slide: 8 NOAA POES L-Band 0.6 Mb/s Metop L-Band 3.5 Mb/s FY-3 L-Band 3.5 Mb/s X-Band 18 Mb/s L-Band NPP/JPSS X-Band 15 Mb/s X/L-Band
9
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS – New Regional Suomi NPP Services Satellites: NOAA POES Metop Suomi NPP Services EARS-ATOVSL1A/C/D EARS-ASCATL2 Winds EARS-AVHRRL0 EARS-IASIL1C + PCS EARS-NWCL2 Clouds EARS-ATMSSDR (L1C) EARS-CrISSDR (L1C) EARS-VIIRSSDR (L1C) Initial Suomi NPP Coverage
10
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-NPP Common part Slide: 10 Geographical coverage: 6 core European stations initially. Other EARS stations to be added if and when NPP data become available. Product processing: CSPP/AAPP, as provided by the CIMSS/NWP-SAF, configured and run by EUMETSAT. Kangerlussuaq Svalbard Athens Lannion Moscow Maspalomas
11
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-NPP EARS-ATMS Slide: 11 Product Segmentation: one file per station pass. Products via EUMETCast (Ku-Band Europe): SDR (Level 1), all 22 channels, all FOV, data on original instrument grid, BUFR format. Timeliness via EUMETCast: 30 minutes. Products via GTS/RMDCN: As for EUMETCast.
12
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-NPP EARS-CrIS Slide: 12 Product Segmentation: one file per station pass. Products via EUMETCast (Ku-Band Europe): SDR (Level 1), 399 channels out of 1305, all FOV, data on original instrument grid, BUFR format. Timeliness via EUMETCast: 30 minutes. Products via GTS/RMDCN: As for EUMETCast.
13
RARS Implementation Group – Sixth meeting Exeter - 2012 EARS-NPP EARS-VIIRS Slide: 13 Product Segmentation: segmented. Duplicates removed. Products via EUMETCast (Ku-Band Europe): SDR (Level 1), geolocation on tie-points, all 16 M-Band channels, HDF5 format, bzip2 compressed. Timeliness via EUMETCast: 15 minutes. Products via GTS/RMDCN: None.
14
RARS Implementation Group – Sixth meeting Exeter - 2012 Building on EARS infrastructure Slide: 14 EUMETCast is EUMETSATs data dissemination system based on DVB over satellite 10-30 Minutes
15
RARS Implementation Group – Sixth meeting Exeter - 2012 Product Processing Slide: 15 CSPP AAPP L1/SDR ATMS & CrIS VFP** L1/SDR VIIRS GTS EUMETCast L1 BUFR ATMS & CrIS BZIP2 L1’ VIIRS L1’’ VIIRS L0/RDR* VIIRS, ATMS & CrIS *: using RT-STPS to produce RDR per instrument from CADU file containing all instruments. **VFP: VIIRS Formatting Package (computes geolocation on tie-points, scale radiances and segments data)
16
RARS Implementation Group – Sixth meeting Exeter - 2012 Slide: 16 Product Quality Monitoring Planned for EAR-NPP EARS-ATMS and EARS-CrIS: -Product quality indicator collected during the processing and recorded (statistics, time series…). -Comparison with global data and independent local products (offline). EARS-VIIRS: -As for EARS-ATMS and EARS-CrIS plus: -VIIRS tie-point and interpolation: geolocation errors to be recorded. Involvement of the SAFs (TBC): -NWP-SAF for EARS-ATMS and EARS-CrIS. -NWC-SAF for EARS-VIIRS.
17
RARS Implementation Group – Sixth meeting Exeter - 2012 Daily Data Volume per Service (October 2012) Estimates for ATMS, CrIS and VIIRS Slide: 17 ServiceNumber of stations Number of satellites Total number of passes Daily volume EARS-ATOVS156420625 EARS-AVHRR7228 (630 segments)1400 EARS-ASCAT713776 EARS-IASI4125500 EARS-NWC7228 (630 segments)800 EARS-ATMS613045 MB EARS-CrIS6130300 MB EARS-VIIRS6114 (300 segments)> 11GB
18
RARS Implementation Group – Sixth meeting Exeter - 2012 Slide: 18 Early Access to Regional NPP Services Early access to the three Regional NPP Services is expected as follows: EARS-ATMS starting in Q4 2012 EARS-CrIS starting in Q4 2012, initially without VIIRS Cloud information EARS-VIIRS starting in Q1 2013
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.