Download presentation
1
Ensuring a 'Flexible Use of Airspace'….
Current ASM process Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, Sep 2012 Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL
2
Flexible Use of Airspace (FUA) Concept
Flexible use of airspace is an airspace management concept described by the International Civil Aviation Organisation (ICAO) and developed by the European Organisation for the Safety of Air Navigation (Eurocontrol), according to which airspace should not be designated as either purely civil or purely military airspace, but should rather be considered as one continuum in which all users’ requirements have to be accommodated to the maximum extent possible.
3
Civil Service Providers
ASM process Network Manager Network Consistency National AMC NATIONAL PLAN Military Users Civil Service Providers Civil users Military planning Civil demand NEGOTIATION
4
Enablers at Local, FAB and Network level
Consistent Airspace Data National AMCs Sharing airspace demands at regular times (from snapshots to rolling airspace plans) Collaborative Decision Making (CDM) System support
5
Ensuring a 'Flexible Use of Airspace'….
Current ASM/ATFCM Processes and Interfaces Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, Sep 2012 ANDERS HALLGREN Manager ASM procedures DNM/COO/NOM/OPL/PRO EUROCONTROL
6
ASM Improvements Initiative
Exploit airspace availability Consistent application of FUA Safe, efficient and accurate data flows Rolling UUP Procedure 2&3 EAW CDR network B2B NOP portal CIAM ASM Support Systems TRA/TSA clarification FL publication CBA designation Support Stakeholders CDR inconsistencies
7
Deliverables Achieved
NOP Portal B2B More CDRs Less Inconsistencies Rolling UUP CDRs Availability
8
Improved Processes and Procedures
At pre-tactical level assess impact by expected airspace allocation Procedure 2: Better exploitation of airspace opportunities on the day of operation
9
Improved Processes and Procedures
Enhanced flexibility on the day of operations ATCO: Tactical rerouting Rerouting via IFPS reprocessing = lower workload AO: less overbooking on D more capacity, predictability, less tactical actions by air crew
10
2012 ASM/ATFCM Process D-1 D NM Time Axis AMCs FMP AO 10 FPLs Users
(Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 10
11
2012 ASM/ATFCM Process D-1 D Time Axis AMCs NM FMP AO 11 FPLs Users
Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) 14.00 15.00 15.00- 16.00 17.00 17.15 12.00 09.00 09.15 NM AUP 12.00- 13.00 UUP 1 Notification UUP 2 Earlier area deactivation Coordin. with other Users D-1 D Final airspace Request > 12.00 >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15> 09.15> Coordin. with AMC CFMU ENV Update Final CDR Request CFMU ENV Database Update eAUP Draft UUP 1 Network and Local assessments 16.00- Coordination with Users 08.00 Draft UUP 2 08.00- Coordination with AMC Requests fine-tuning (D) 13.00- Network impact assessment Coordination Coordination Network impact assessment 11
12
2012 ASM/ATFCM Process FPLs D-1 D CFMU ENV Database Update eAUP Time
Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) 14.00 15.00 15.00- 16.00 17.00 17.15 12.00 09.00 09.15 Network impact assessment NM AUP 12.00- 13.00 UUP 1 Notification UUP 2 Earlier area deactivation Coordin. with other Users D-1 D Final airspace Request > 12.00 >08.00 React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15> 09.15> Coordin. with AMC CFMU ENV Update Final CDR Request Coordination Draft UUP 1 Network and Local assessments 16.00- Coordination with Users 08.00 Draft UUP 2 08.00- Coordination with AMC Requests fine-tuning (D) 13.00- eAUP CFMU ENV Database Update CFMU ENV Database Update eAUP FPLs FPLs 12
13
2012 ASM/ATFCM Process UUP 1 UUP 2 D-1 D Time Axis AMCs NM FMP AO 13
(Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP UUP 1 Coordin. with other Users Draft UUP 2 AMCs UUP 2 Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 13
14
2012 ASM/ATFCM Process Notification Notification D-1 D Time Axis AMCs
(Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request Notification Notification FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 14
15
2012 ASM/ATFCM Process Rerouting Proposals to AOs
D-1 D Time Axis (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Rerouting Proposals to AOs NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 15
16
2012 ASM/ATFCM Process React (CHG, CNL or new FPL) React (CHG, CNL or
D-1 D Time Axis (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP React (CHG, CNL or new FPL) React (CHG, CNL or new FPL) Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 16
17
UUP PUBLICATION D-1 D-1 D-OPS 16.00 17.00 18.00 19.00 20.00 06.00
Winter time
18
UUP PUBLICATION D-OPS D-OPS 07.00 08.00 09.00 10.00 11.00 12.00 20.00
Winter time
19
CDR Network
20
Uptake CDRs
21
Rolling UUP
22
Rolling UUP
23
UUP Publication March 2012 Not Using CIAM Using UUP Not Using UUP
24
Improved Economies
25
Environmental Benefits
26
Ensuring a 'Flexible Use of Airspace'…. Thank you for attention!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.