Presentation is loading. Please wait.

Presentation is loading. Please wait.

→ SPACE SITUATIONAL AWARENESS PRECURSOR PROGRAMME CO-VIII & DC-II Industry Day.

Similar presentations


Presentation on theme: "→ SPACE SITUATIONAL AWARENESS PRECURSOR PROGRAMME CO-VIII & DC-II Industry Day."— Presentation transcript:

1 → SPACE SITUATIONAL AWARENESS PRECURSOR PROGRAMME CO-VIII & DC-II Industry Day

2 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 2 European Space Agency -The SSA Precursor Programme -Precursor Services Objectives -Past and Present Activities -Link between CO-VIII and DC-II -CO-VIII ITT -Objectives -Content -Key issues -Questions and Answers OUTLINE

3 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 3 European Space Agency BACKGROUND Image: Dan Durda – FIAAA

4 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 4 European Space Agency 2009 – 2012 Preparatory Programme –Governance Definition –Data Policy –Architecture –Federation –Precursor Services –Radar Breadboard –Pilot Data Centres 2013 – 2020 Development/ Operational Phase –Development of essential components –SSA Exploitation INTRODUCTION Current Objectives

5 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 5 European Space Agency 1.Core Element SSA Architecture Governance Data Policy Security Space Surveillance and Tracking Segment 2.Space Weather Element (including NEO activities) 3.Radar Element Prototype Development 4.Pilot Data Element Transversal support for all segments INTRODUCTION SSA Programme Structure

6 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 6 European Space Agency Austria Belgium Finland France Germany Greece Italy Luxembourg Norway Portugal Spain Switzerland United Kingdom Canada (in discussion) INTRODUCTION SSA Participating States

7 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 7 European Space Agency INTRODUCTION SSA Programme Structure Tasking Centre SWE Space Weather Centre NEO Near Earth Objects Centre SST Space Surveillance & Tracking Centre

8 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 8 European Space Agency DC-II ITT

9 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 9 European Space Agency SST PRECURSOR SERVICE OBJECTIVES

10 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 10 European Space Agency OVERALL SYSTEM

11 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 11 European Space Agency SSA Preparatory Programme parallel stream goal is to be able to perform representative testing of proposed solutions through precursor services: –Scaleable solutions –Representative of full systems –Provide measurable results with reduced data set –Characterise current European resources –Enable evaluation of performance using of available European assets –Provide test-bed for innovative solutions SST PRECURSOR SERVICES GOAL

12 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 12 European Space Agency PRECURSOR SERVICES 1. Catalogue of man- made objects 2. Collision Avoidance 3.Fragmen- tations 4. Re-entry predictions 5. Mission characterisation 6. Mission Support 7. Small objects Operators General public General public Science specialists Science specialists State authorities State authorities Search and initialisation Warning bulletins Attitude motion Warning bulletins Orbits and covariances TIP messages Debris detections Internat. ID, classification Mass, area Orbits and covariances Orbits and covariances Man- euvers Segment Cervices Data policy control filters Expected User Community Maneu vers Products

13 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 13 European Space Agency SST PRECURSOR SERVICES SELECTION Catalogue of Man-Made Objects Core of the SST service Provides one additional service directly through the correlation process Collision Avoidance Drives the precision requirements for the catalogue Drives the coverage requirements for the sensor network Drives both surveillance and tracking systems Re-entry Prediction Requires active filtering of the catalogue to produce sub-set of target objects Will drive some limiting needs of a tracking system Introduces new disciplines into the SST segment Fragmentation Detection Initiated by correlation process in catalogue maintenance Requires rapid tasking, recalculation and prediction to support other services

14 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 14 European Space Agency PAST AND PRESENT ACTIVITIES Image: Dan Durda – FIAAA

15 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 15 European Space Agency PAST ACTIVITIES CO-I part IOptical System to complement traditional radar sensors Catalogue/Collision avoidance requirement driven NEO component

16 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 16 European Space Agency CURRENT ACTIVITIES CO-I part IIOverall requirements and architecture Provides definition to the service requirements CO-VTelescope analysis and design CO-VISST Precursor Services Deployment Install current ESA conjunction prediction tool (CRASS) Create web-based front-end to CRASS Develop data model for SST Characterise current European SST assets

17 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 17 European Space Agency CO-VIII and DC-II LINKAGE

18 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 18 European Space Agency LINK BETWEEN CO-VIII and DC-II

19 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 19 European Space Agency CO-VIII OBJECTIVES

20 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 20 European Space Agency CO-VIII OBJECTIVES –Create future collision avoidance framework –Provide re-entry service baseline –Generate representative data for test and validation exercises

21 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 21 European Space Agency Provide core conjunction prediction Develop future baseline code for development Expand upon earlier capabilities –Interface with an SQL database (input and output) –Perform all-on-all conjunction analysis Retain single-object/catalogue capability –Allow parallel processing on large datasets –Automated input/output –Interface with current web-based front-end CONJUNCTION PREDICTION

22 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 22 European Space Agency New precursor service Predict uncontrolled re-entries Use SQL database for data source Provide multiple outputs: –Number of candidate objects –Impact ellipsoid plot Automatic input/output Interface with web-based front-end RE-ENTRY PREDICTION

23 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 23 European Space Agency Real data required to: –DC-II [test SST process pipeline] Track management Orbit determination Correlation –CO-VIII [conjunction prediction & re-entry prediction] Conjunction algorithms Possible filtering techniques Re-entry coordination Two classes –Surveillance data –Tracking data Two tasks –Data planning –Data execution TEST AND VALIDATION DATA GENERATION

24 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 24 European Space Agency WP-1Conjunction Prediction System –WP-1.1Conjunction Prediction System Design –WP-1.2Conjunction Prediction System Implementation –WP-1.3Conjunction Prediction System Deployment –WP-1.4Conjunction Prediction System Maintenance WP-2Re-entry Prediction System –WP-2.1Re-entry Prediction System Design –WP-2.2Re-entry Prediction System Implementation –WP-2.3Re-entry Prediction System Deployment –WP-2.4Re-entry Prediction System Maintenance WP-3Test and Validation Data Generation –WP-3.1Test and Validation Data Requirements Planning –WP-3.2Test and Validation Data Acquisition Management WORK PACKAGE ORGANISATION

25 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 25 European Space Agency WORK PACKAGES Function Work Package Conjunction Prediction Re-entry Prediction Test and Validation Data Generation Design 1.12.13.1 Requirements Planning Implementation 1.22.23.2 Data Acquisition Management Deployment 1.32.3 Maintenance 1.42.4

26 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 26 European Space Agency WORK PACKAGES

27 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 27 European Space Agency CO-VIII: OPTIONS As with DC-II, bidders are asked to provide an offer for the annual maintenance of the systems for at least three years after the end of the contract The option will not be valid until the end of the contract; ESA unlikely to take this option until FAT completion (at earliest).

28 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 28 European Space Agency CO-VIII KEY ISSUES: IPR AND SW REUSE As with DC-II: “SSA needs to own the IPR of all non-COTS software that it will eventually operate. This is needed to allow SSA to license the SW in future contracts (development, maintenance, and operations) and eventually transfer the SSA system to a third party for operations.” As a result: – All software developed will be considered as “operational software” in the contract – “When offers are based on re-using software where ESA does not already own the IPR, the bidders are expected to transfer to ESA the IPR in the form of a written agreement at no cost or provide - as an option - the cost of transferring the IPR for these systems to ESA for use in SSA.”

29 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 29 European Space Agency CO-VIII KEY ISSUES: IPR AND SW REUSE The right to exercise the transfer of IPR options need to be valid for at least 3 years from KO. These IPR transfer option costs (if any) will not be considered within the ITT envelope but must be quoted. ESA is unlikely to take the IPR options at KO; instead this will be a decision taken later based on the success of the development and the likelihood to use it a basis for the full programme implementation. Any IPR offered to ESA shall be subject to “due diligence” procedures from ESA before the transfer can be completed. Any IPR transfer to ESA does not exclude the bidder from continuing to use the offered software. ESA will normally grant the bidder a licence. In all cases (with or without IPR transfer) the bidder needs to provide a license to ESA for the indefinite continued use of the software. The ESA draft contract attached to the ITT will specify the complete terms and conditions with regard to Operational Software and re-use of existing/third party products.

30 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 30 European Space Agency CO-VIII KEY ISSUES: ESA CFI SST Pilot Data Centre site infrastructure (ESAC) SST Test and Validation Centre site infrastructure (ESAC) SST Pilot Data Centre ICT infrastructure (ESAC) SST Test and Validation Centre (ESAC) ICT infrastructure Outputs from on-going precursor implementation activities (e.g. CO- VI) when relevant

31 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 31 European Space Agency CO-VIII KEY ISSUES: NON CFI development infrastructure; Contractor needs to provide a “representative” environment COTS linked to bidders software re-use algorithm specifications test data initial object catalogue

32 Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-II Page: 32 European Space Agency QUESTIONS? Ariane 5 V198 Launch (Hylas-1 & Intelsat-17) 16 th November 2010


Download ppt "→ SPACE SITUATIONAL AWARENESS PRECURSOR PROGRAMME CO-VIII & DC-II Industry Day."

Similar presentations


Ads by Google