Presentation is loading. Please wait.

Presentation is loading. Please wait.

8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.

Similar presentations


Presentation on theme: "8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status."— Presentation transcript:

1 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status Level 2 group activities time schedule IPF/F-PAC upgrade time schedule ESLs/PDS interfaces during Commissioning Phase ESLs/IPF readiness status Conclusions

2 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 2 Level 2 group activities time schedule L to L + 3 months: –Phase 1 of L1b group activities –L1b/L2 data used for L2 algorithms verification at ESRIN L + 3 to L + 4 months: –Phase 2 of L1b group activities –systematic L2 algorithms verification by ESLs (coarse tuning) –L0, L1b and L2 data disseminated to ESLs and CCVT L + 4 to L + 6 months: –systematic L2 algorithms verification by ESLs (fine tuning) –L0, L1b and L2 data disseminated to ESLs and CCVT

3 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 3 IPF/F-PAC upgrades time schedule

4 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 4 ESLs/PDS interfaces during CP

5 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 5 ESLs/IPF/F-PAC readiness review ESLs ready for EnviSat launch: –ref. processors code and DPMs/IODDs updated and checked by ESA –new e-2-e TDS produced to test the new algorithms/interfaces in IPF/F-PAC –frozen state of ref. Processors codes/documentation IPF upgrade on-going: –new documents/TDS delivered by ESA to ALCATEL F-PAC software upgrade on-going: –e-2-e TDS available for F-PAC testing –discrepancies between IPF and F-PAC identified

6 8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 6 Conclusions Strategies for L2 algorithms verification already specified –see RA2/MWR Level 2 algorithms verification and products validation plan (PO-PL-ESR-RA-0034 iss. 1.c) for more details Tools needed for these activities already developed (MSSL) or under development (CLS)


Download ppt "8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status."

Similar presentations


Ads by Google