Highway 13 & Highway 101 Interchange Construction SP 7001-103 Savage, Scott County Municipal Consent Public Hearing December 7, 2009.

Similar presentations


Presentation on theme: "Highway 13 & Highway 101 Interchange Construction SP 7001-103 Savage, Scott County Municipal Consent Public Hearing December 7, 2009."— Presentation transcript:

1 Highway 13 & Highway 101 Interchange Construction SP 7001-103 Savage, Scott County Municipal Consent Public Hearing December 7, 2009

2 2 Highway 13 Corridor Area Overview Howard Preston CH2MHill

3 Stakeholder Workshop December 6, 2006 December 7, 2009

4 Stakeholder Workshop December 6, 2006 December 7, 20094

5 Stakeholder Workshop Concepts and Preliminary Evaluation TH 13 Concept 1 Increase capacity of at-grade intersection with additional through and turn lanes TH 13 Concept 2 Roundabout TH 13 Concept 3 Grade-Separation Grade-Separation December 7, 20095

6 Stakeholder Findings Meeting January 10, 2007 December 7, 20096

7 7 Project Overview Lynn Clarkowski Mn/DOT Metro District — South Area Manager

8 December 7, 20098 Project Overview – Existing Conditions

9 Crash Data TH 13/TH 101 intersection was ranked #18 on the statewide-list of Top 200 Highest Crash Cost intersections (Mn/DOT crash data from 2005-2007) TH 13/TH 101 intersection was ranked #18 on the statewide-list of Top 200 Highest Crash Cost intersections (Mn/DOT crash data from 2005-2007) Crash cost/year = $1.2 million Crash cost/year = $1.2 million 106 crashes in Project area 106 crashes in Project area 75% of those crashes were rear-ends crashes 75% of those crashes were rear-ends crashes 33% of those crashes resulted in injury 33% of those crashes resulted in injury December 7, 20099 9

10 10 Project Benefits Safety - It is anticipated that the project improvements will reduce number of crashes at the intersection by around 80%. Safety - It is anticipated that the project improvements will reduce number of crashes at the intersection by around 80%. Mobility - Currently, the TH 13 and TH 101 intersection has a capacity of 4,400 vehicles per hour. The project will more than double the capacity of the intersection. Mobility - Currently, the TH 13 and TH 101 intersection has a capacity of 4,400 vehicles per hour. The project will more than double the capacity of the intersection. Floodplain - Raise eastbound lanes of highway above the 100-year floodplain elevation. Floodplain - Raise eastbound lanes of highway above the 100-year floodplain elevation. Bus Shoulders - Widen outside shoulders in each direction to accommodate buses. Bus Shoulders - Widen outside shoulders in each direction to accommodate buses.

11 December 7, 200911 Highway 13 & Highway 101 Interchange Project Timeline 2007 Scott County applied for and received Federal Funding 2007 Scott County applied for and received Federal Funding (for fiscal year 2012) 2008 Mn/DOT started working on preliminary design 2008 Mn/DOT started working on preliminary design August 2008 Open House August 2008 Open House Met Council Approval for scope change (leaves 126 th St signal in place) Met Council Approval for scope change (leaves 126 th St signal in place) December 2008 Informational Meeting December 2008 Informational Meeting February 2009 Council Meeting February 2009 Council Meeting September 2009 project accelerated using American Recovery Reinvestment Act (ARRA) funding September 2009 project accelerated using American Recovery Reinvestment Act (ARRA) funding 2010 construction 2010 construction

12 December 7, 200912 Highway 13 & Highway 101 Interchange Project Funding $7.84 million in Federal Surface Transportation Program funding (accelerated to 2010) $7.84 million in Federal Surface Transportation Program funding (accelerated to 2010) $2 million in Scott County wheelage tax (match for Federal funding) $2 million in Scott County wheelage tax (match for Federal funding) $885,000 in State Safety Capacity funding (accelerated to 2010) $885,000 in State Safety Capacity funding (accelerated to 2010) Around $5 million in ARRA funding Around $5 million in ARRA funding

13 December 7, 200913 Project Overview – Proposed Conditions Bridge eastbound Highway 13/Highway 101 Bridge eastbound Highway 13/Highway 101 (bridge is longer than initially proposed) Raise eastbound lanes above 100-year floodplain elevation Raise eastbound lanes above 100-year floodplain elevation Ramp construction Ramp construction Signalize lefts on and off westbound Signalize lefts on and off westbound Highway 13/Highway 101 Access closures/modifications Access closures/modifications Leave Highway 13/126 th St signal, but add pedestrian crossings Leave Highway 13/126 th St signal, but add pedestrian crossings

14 December 7, 200914 December 7, 2009 14 Access Closures/Modifications Highway 13 and Louisiana Avenue Highway 13 and Louisiana Avenue –From a full access, uncontrolled intersection –To full closure Highway 13 and Rhode Island Avenue Highway 13 and Rhode Island Avenue –From a right-in/right-out –To full closure Highway 101 and Zinran Avenue Highway 101 and Zinran Avenue –From a ¾ intersection –To right-in only

15 December 7, 200915 December 7, 2009 15

16 16 December 7, 2009 16 Frequently Asked Questions Why didn’t Mn/DOT consider a design that eliminated the need for any signalized intersection, with access to TH 13 via ramps only? Would require grade separation of two bridges (a bridge over the eastbound bridge or two ramp bridges) Would require grade separation of two bridges (a bridge over the eastbound bridge or two ramp bridges) Grades would necessitate a change of access at Highway 13 and 126 th St Grades would necessitate a change of access at Highway 13 and 126 th St Many ramps are signalized at interchanges Many ramps are signalized at interchanges

17 December 7, 200917 December 7, 2009 17 Frequently Asked Questions The design still requires a weave to enter TH 169 northbound, vehicles will need to cross two lanes of full speed traffic, can the weave be eliminated? Would require a westbound bridge Would require a westbound bridge Balancing benefits and cost Balancing benefits and cost Weaving distances meet standards Weaving distances meet standards Looking to improve northbound TH 169 entrance ramp capacity during AM peak period Looking to improve northbound TH 169 entrance ramp capacity during AM peak period

18 December 7, 200918 December 7, 2009 18 Frequently Asked Questions Will this project really help traffic flow in the morning if no improvements are made to TH 169 northbound? Improvements made in stages Improvements made in stages I-494/TH 169 project I-494/TH 169 project Northbound TH 169 weave to Old Shakopee Rd exit ramp Northbound TH 169 weave to Old Shakopee Rd exit ramp Non-peak benefits Non-peak benefits

19 December 7, 200919 December 7, 2009 19 Frequently Asked Questions Can the access at Zinran Avenue be moved to the west to allow a right-out onto TH 13? If so, how far would it have to be moved? Corridor vision and access management Corridor vision and access management Intersection influence area Intersection influence area For weaving at Zinran Ave, 1500 feet minimum and 2000 feet desirable For weaving at Zinran Ave, 1500 feet minimum and 2000 feet desirable Only 200 feet from Zinran Ave to exit ramp Only 200 feet from Zinran Ave to exit ramp Eastbound grade rising for bridge Eastbound grade rising for bridge

20 December 7, 200920 December 7, 2009 20 Frequently Asked Questions If a right-out access onto TH 13 at Zinran Avenue cannot remain, can a right-out on the TH 13 southbound turn lane be designed? Intersection influence area Intersection influence area Speed differentials of high-speed deceleration Speed differentials of high-speed deceleration and low-speed acceleration Would need to weave on southbound TH 13 Would need to weave on southbound TH 13 to make U-turn at 126 th St signal

21 December 7, 200921 December 7, 2009 21 Frequently Asked Questions Can a right-in and/or right-out at Louisiana Ave be allowed until a traffic signal is installed at Dakota Avenue? Corridor vision and access management Corridor vision and access management Intersection influence area Intersection influence area Traffic on entrance ramp is accelerating, watching mainline traffic and preparing to merge Traffic on entrance ramp is accelerating, watching mainline traffic and preparing to merge Entrance ramp merge area to main line is at Louisiana Ave (no room for the 1500 – 2000 feet weave and a 500-foot turn lane for the right-in or the 1000 feet minimum – 1500 feet desirable for the right-out) Entrance ramp merge area to main line is at Louisiana Ave (no room for the 1500 – 2000 feet weave and a 500-foot turn lane for the right-in or the 1000 feet minimum – 1500 feet desirable for the right-out)

22 December 7, 200922 December 7, 2009 22 Frequently Asked Questions The local streets will take more traffic as a result of the access closures, does Mn/DOT have funding to offset any expected costs related to the local roadways? The City may use State Aid funding on designated Municipal State Aid Streets The City may use State Aid funding on designated Municipal State Aid Streets –Zinran Ave –126 th St

23 December 7, 200923 December 7, 2009 23 Frequently Asked Questions Will business signage be allowed that can direct traffic to the local businesses after construction is completed? During construction? Engineering Standards Engineering Standards Mn/DOT Policy Mn/DOT Policy Mitigation for construction impacts on businesses Mitigation for construction impacts on businesses

24 December 7, 200924 Project Construction and the Design-Build Process Michael Beer Mn/DOT Metro District — Eden Prairie Construction Resident Engineer

25 December 7, 200925 Design-Build Process Design-build is a contracting process that brings designers and contractors together early in the detail design portion of a project. The owner clearly defines the standards and general specifications they expect for a project, and the design-build team works together to satisfy those requirements. Design-build is a contracting process that brings designers and contractors together early in the detail design portion of a project. The owner clearly defines the standards and general specifications they expect for a project, and the design-build team works together to satisfy those requirements. http://www.dot.state.mn.us/designbuild/ http://www.dot.state.mn.us/designbuild/ http://www.dot.state.mn.us/designbuild/

26 December 7, 200926 December 7, 2009 26 Project Construction Design flexibility Design flexibility Traffic control during construction Traffic control during construction City involvement City involvement Business Liaison Contact Business Liaison Contact Construction coordination with other Construction coordination with other projects in the area

27 December 7, 200927 Current Project Schedule Request for Letters of Interest Request for Letters of Interest –Posted October 13, 2009 Request for Qualifications Request for Qualifications –Posted November 13, 2009 Request for Proposals – late-January Request for Proposals – late-January Construction Start – May 2010 Construction Start – May 2010 Construction Completion – end of 2010 Construction Completion – end of 2010

28 December 7, 200928 Contacts Web site: http://www.dot.state.mn.us/metro/projects/hwy13savage/ Web site: http://www.dot.state.mn.us/metro/projects/hwy13savage/ http://www.dot.state.mn.us/metro/projects/hwy13savage/ Michael Beer, Eden Prairie Construction Resident Engineer Michael Beer, Eden Prairie Construction Resident Engineer Mn/DOT Metro District michael.beer@state.mn.us michael.beer@state.mn.us (952/826-6778) michael.beer@state.mn.us Lynn Clarkowski, South Area Manager Lynn Clarkowski, South Area Manager Mn/DOT Metro District lynn.clarkowski@state.mn.uslynn.clarkowski@state.mn.us (651/234-7729) lynn.clarkowski@state.mn.us John Powell, Public Works Director John Powell, Public Works Director City of Savage jpowell@ci.savage.mn.us jpowell@ci.savage.mn.us (952/882-2672) jpowell@ci.savage.mn.us

29 Questions and Discussion