Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools
3
Lower Level First Floor Second Floor Third Floor
4
Eastchester Union Free School District Proposition One First Floor Middle School & High School
5
High School
6
Shared Wing
7
Middle School
8
Eastchester Union Free School District Proposition One First Floor Highlights
9
Old Gymnasium Revovated to New Cafeteria Capacity 260+
10
Commons: Meeting space for student clubs during lunch hours Small group instruction space during instructional time
11
Other school uses: Study halls Small group instruction Community uses: Holding large scale events that can be catered General community meetings
12
First floor of the Eastchester High School to replace the footprint of the existing cafeteria
13
1 st Floor Middle School
14
Eastchester Union Free School District Proposition One Second Floor Middle School & High School
15
High School
16
Shared Wing
17
Middle School
18
Eastchester Union Free School District Proposition One Second Floor Highlights
19
Mezzanine to High School Cafeteria Current old gymnasium
20
School uses: Additional eating area for students Meeting lunch space for staff Small group instruction Drop in study center Wireless laptop use
21
Second Floor High School Addition
22
Second Floor Middle School Addition
23
New Middle School Elevator from 1 st floor to 2 nd floor ADA Requirement
24
Eastchester Union Free School District Proposition One Third Floor High School
25
High School
26
Eastchester Union Free School District Proposition One Third Floor Highlights
27
3 rd Floor High School Addition
28
Utilizing Every Square Inch” Eastchester Union Free School District Proposition One Lower Level “Basement” “ Utilizing Every Square Inch”
29
High School
30
Eastchester Union Free School District Proposition One Lower Level Highlights
31
Lower Level High School
32
Eastchester Union Free School District Additional Needs “ Proposition Two”
33
Middle School Cafeteria Expansion Instrumental Lesson Rooms
34
Two Instrumental Lesson Rooms 410 Square feet each
35
Middle School Cafeteria Expansion Instrumental Lesson Rooms
36
Middle School Cafeteria Expansion provides an additional 1235 square feet
40
HighlightsHighlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, 2008. The plans for the renovation and construction project at the High School and Middle School include the following:
41
At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): 7 NEW general education classrooms 4 NEW small group instruction classrooms 4 NEW science (lab) rooms 1 NEW art classroom 1 NEW physical education/fitness station 4 NEW toilet rooms 3 RENOVATED art classrooms 2 RENOVATED small group instruction classrooms Renovated cafeteria (relocated) with a commons and multi- purpose room and drop-in study center Proposition 1 ($19,600,000)
42
4 NEW general education classrooms 1 NEW technology classroom 1 NEW science/lab 1 NEW elevator Proposition 1 ($19,600,000) At Eastchester Middle School:
43
2 NEW instructional music/multipurpose rooms Renovation/expansion of cafeteria Proposition 2 ($1,285,000) At Eastchester Middle School: