Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.

Similar presentations


Presentation on theme: "Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools."— Presentation transcript:

1

2 Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools

3 Lower Level First Floor Second Floor Third Floor

4 Eastchester Union Free School District Proposition One First Floor Middle School & High School

5 High School

6 Shared Wing

7 Middle School

8 Eastchester Union Free School District Proposition One First Floor Highlights

9 Old Gymnasium Revovated to New Cafeteria Capacity 260+

10 Commons: Meeting space for student clubs during lunch hours Small group instruction space during instructional time

11 Other school uses: Study halls Small group instruction Community uses: Holding large scale events that can be catered General community meetings

12 First floor of the Eastchester High School to replace the footprint of the existing cafeteria

13 1 st Floor Middle School

14 Eastchester Union Free School District Proposition One Second Floor Middle School & High School

15 High School

16 Shared Wing

17 Middle School

18 Eastchester Union Free School District Proposition One Second Floor Highlights

19 Mezzanine to High School Cafeteria Current old gymnasium

20 School uses: Additional eating area for students Meeting lunch space for staff Small group instruction Drop in study center Wireless laptop use

21 Second Floor High School Addition

22 Second Floor Middle School Addition

23 New Middle School Elevator from 1 st floor to 2 nd floor ADA Requirement

24 Eastchester Union Free School District Proposition One Third Floor High School

25 High School

26 Eastchester Union Free School District Proposition One Third Floor Highlights

27 3 rd Floor High School Addition

28 Utilizing Every Square Inch” Eastchester Union Free School District Proposition One Lower Level “Basement” “ Utilizing Every Square Inch”

29 High School

30 Eastchester Union Free School District Proposition One Lower Level Highlights

31 Lower Level High School

32 Eastchester Union Free School District Additional Needs “ Proposition Two”

33 Middle School Cafeteria Expansion Instrumental Lesson Rooms

34 Two Instrumental Lesson Rooms 410 Square feet each

35 Middle School Cafeteria Expansion Instrumental Lesson Rooms

36 Middle School Cafeteria Expansion provides an additional 1235 square feet

37

38

39

40 HighlightsHighlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, 2008. The plans for the renovation and construction project at the High School and Middle School include the following:

41 At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): 7 NEW general education classrooms 4 NEW small group instruction classrooms 4 NEW science (lab) rooms 1 NEW art classroom 1 NEW physical education/fitness station 4 NEW toilet rooms 3 RENOVATED art classrooms 2 RENOVATED small group instruction classrooms Renovated cafeteria (relocated) with a commons and multi- purpose room and drop-in study center Proposition 1 ($19,600,000)

42 4 NEW general education classrooms 1 NEW technology classroom 1 NEW science/lab 1 NEW elevator Proposition 1 ($19,600,000) At Eastchester Middle School:

43 2 NEW instructional music/multipurpose rooms Renovation/expansion of cafeteria Proposition 2 ($1,285,000) At Eastchester Middle School:

44

45