EuRoPol Gaz main events 1993, EuRoPol Gaz S.A. foundation 1994, the European Union priority project 1998, beginning of construction 2000, the system partly in operation 2005, the first pipeline reached the target capacity
4
General description of the section
5
Technical Parameters Total length of the Pipeline - 685 km Pipeline Diameter of pipe: 1420 mm Maximum operating pressure: 8.4 MPa 5 Compressor Stations Total installed power of 5 compressor stations: 600 MW Total capacity of the existing first line: 32.3 billion cubic meters per year
6
VIABILITY ASSESSMENT ISSUE CASE ACASE BCASE C Availability of capacityYES Contractual requirementYES Regulation adequacyYES Tariff level and transparency111 Conflict resolution adequacyYES Availability of upstream gasYES Downstream price regulation problems N/A Balancing requirement problemsNO Availability of storage and flexibility services NO