New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of Petroleum Storage Systems
2
Section A : Packaged Work Scopes 2
3
3 A-1: Pumping Test or Multi-Phase Pilot Test (In House) The base hrs have been changed from 12 to 10, kits from 120% to 100% Excluded permit hrs and NPDES fee Can now task any combination of whole or partial days (1/10 day) Should be adjusted to nearest 1/10 day actual
4
4 A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House) Merged prior separate single or combined templates Changed base hrs from 14 to 10, kits from 140% to 100% Excluded permit hours Can now task any combination of whole or partial days by 1/10 Should be adjusted to nearest 1/10 day actual
5
A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House) 5 BeforeAfter
6
6 A-3: Monthly O&M Visit Can be used for in house inspection to evaluate DEP-owned equipment not located at subject property for potential re-use reservation Do not use for subcontractors
7
7 A-4, 5, 6: Small Medium & Large RAI Monthly Allowances Added water level measurements
8
8 Section B: Office Activities, Part I
9
9 B-1: Proposal Preparation Excluded for LTNAM work orders or when only task is RAP, RAPMOD or continuation of on-going NAM or PARM
10
10 B-4: Site Health & Safety Plan Must be comprehensive Not allowed more than once per contractor, except in extenuating circumstances
11
11 B-5: Notice Of Discovery of Contamination Package Includes copies of existing contamination plume maps
12
12 Section C : Field Activities
13
13 Section C : Field Activities C-3 & 4: Drilling Setup Now 1 & 2 person options with corresponding 1 or 2 person kit Changed 2 hrs to 1 hr/person and 20% to 10% kit Excluded time for on/off site utility clearance Does not apply to well abandonment or DPT, but may apply to drilling with auger attachment only of DPT rig
14
14 Section C : Field Activities C-5 through 16: SB for Soil Screening or Piezometer Install (all depths) & Single or Double Cased Well Installation Up to 40 ft Now 1 & 2 person options with corresponding 1 or 2 person kit
15
15 Section C : Field Activities C-17 through 22: Single Cased Recovery or Multi-Phase Well Installation/Injection Well Installation/Soil Vapor Extraction Well Installation (all up to 40 ft) Now 1 & 2 person options with corresponding 1 or 2 person kit Added multi-phase wells and injection wells Changed MW installation kit to piezometer or remediation well installation kit Excludes TOC survey if applicable Includes ½ hr for development
16
Section C : Field Activities 16 Well Install: Single Case/Multi Case/ Recovery/AS/Soil VE 40’ use backup spreadsheet and enter in Section D: Other Field Work)
17
17 Section C : Field Activities C- 23: Well or Piezometer Abandonment One Person Added 10% modified level D Added 10% per diem
18
18 Section C : Field Activities C-25, 26, 29, 30: Well Sampling with Water Level and Area Survey Now 1 & 2 person options with corresponding 1 or 2 person kit
19
19 C-31 Through 34: Oversight Kits & Per Diem All may be tasked in any* combination of whole or partial day (1/10 day) *Per diem requires > 1 consecutive day of field work, otherwise prorated to 1/10 day Oversight Kit is 2 person soil assessment kit less per diem (one size fits all) For field work (includes required sampling and testing equipment) Oversight Allowance has vehicle and modified level D for 2 persons (one size fits all) For use when sampling/testing equipment is not required
20
Section C: Field Activities BeforeAfter 20
21
21 Section H: Office Activities, Part II
22
22 H-1: General/SA Report Changed 25% to 20% of field work in sections C & D Not used after SAR approval Reiterate existing $10K cap per work order
23
23 H-2: Letter/NPDES Report Though limited to quarterly, includes 3 monthly discharge reports on DEP form 62- 620.910(10)
24
24 H-4: O&M Annual Report Must be signed and sealed by registered P.E.
25
25 H-7 Through 10: RAP or RAPMOD, All Levels, Full & Limited Scope Must be signed and sealed by registered P.E. No proposal prep allowed if only scope of work
26
H-14: Construction Drawings and Specifications Generally not allowed in conjunction with source removal work orders 26
27
H-15: Bid Package, Solicitation and Evaluation This document should be prepared either subsequent to or concurrent with the preparation of construction drawings (used to say prior to) 27
28
H-19: Long Term Natural Attenuation Plan For LTNAM only No proposal prep if only scope of work 28
29
H-20 & 21: RA Interim and General RA Reports Use depends on the level of effort See Template Descriptions in Appendix A.1 See SOP Section 5.8.3 for template report options for SSA during RA Phase 29 September 25, 2007
30
Section H: Office Activities, Part II BeforeAfter 30
31
Template Report Options for SSA During RA Phase Section 5.8.3 – Three template report options H-20: RA Interim Report – use directly if sampling 10 or less MWs or installing & sampling 3 or less MWs/borings H-21: RA General Report – use equivalent in ‘Other’ report type (H-26) if sampling 10 to 20 MWs or installing & sampling 4 to 10 MWs/borings H-17: Soil Source Removal Report – use equivalent in ‘Other’ report type (H-26) if sampling more than 20 MWs or installing & sampling more than 10 MWs/borings 31
32
Template Equipment Kits (18) All kits, except In-House RAC, FP Recovery and Oversight split into 1 & 2 person options Added Oversight Kit (with equipment) and Oversight Allowance (no equipment), excludes per diem, one size covers 1 or 2 persons Added wash tubs, garbage can/bags, rake, sample labels and step ladder to example expendables list 32
33
Equipment Rate Schedule: (1 and 2 Person Options) 33
34
Equipment Rate Schedule: Oversight Kits 34
35
Equipment Rate Schedule: Added Expendables 35
36
SOP Appendix A.1 The preapproval template workbooks, template descriptions, template breakdown, and template equipment kit rate schedules can be found in SOP Appendix A.1 THE END 36