Download presentation
Presentation is loading. Please wait.
Published byEliezer Shireman Modified over 10 years ago
1
Time Series for Central West Grand Terre Island of the Lafourche Shoreline 1984 - 2007 Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University of New Orleans Karen A Westphal
2
The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison. The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison.
3
Location of Grand Terre Island, Louisiana West Grand Terre Island is in BICM region “Lafourche Delta” and BICM segment 45 “Grand Terre Island”
4
1984 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north All photos registered to this point July 9, 1984
5
1988 post-Hurricane Gilbert 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north October 12, 1988
6
1990 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north June 25, 1990
7
1992 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north July 9, 1992
8
1993 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north June 16, 1993
9
1994 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north July 26, 1994
10
1996 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north July 17, 1996
11
1999 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north August 27, 1999
12
2001 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north June 14, 2001
13
2002 post-Tropical Storm Isodore 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north October 1, 2002
14
2002 post-Hurricane Lili 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north October 5, 2002
15
2004 pre-Hurricane Ivan 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north September 13, 2004
16
2004 post-Hurricane Ivan 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north September 18, 2004
17
2005 post-Hurricane Rita 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north September 30, 2005
18
February 2007 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north February 26, 2007
19
April 2007 29 º 17 ’ 02"/89 º 54 ’ 04 ” - View to north April 20, 2007
20
10 Years 1984 1994
21
13 Years 1994 2007
22
23 Years 1984 2007
23
Relevant Coastal Restoration Projects Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island. State Project Number: BA-28 Project Priority List (PPL): 07 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Type: Vegetation Planting Construction Completion Date: 2001 Description: The goal of this project is to stabilize dredged material sites on West Grand Terre Island. This objective was achieved through vegetation plantings and by purchasing grazing rights on the island for the life of the project (20 years). East/West Grand Terre Islands Restoration. State Project Number: BA-30 Project Priority List (PPL): 09 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Types: Barrier Island, Marsh Creation Construction Completion Date: Pending Description: The goal of this project is to stabilize and benefit 1,575 acres of barrier island habitat and extend the island's life expectancy. Dredged material will be used to create dune and marsh habitat on East Grand Terre Island. http://dnr.louisiana.gov/crm/coastres/projectlist.asp Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island. State Project Number: BA-28 Project Priority List (PPL): 07 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Type: Vegetation Planting Construction Completion Date: 2001 Description: The goal of this project is to stabilize dredged material sites on West Grand Terre Island. This objective was achieved through vegetation plantings and by purchasing grazing rights on the island for the life of the project (20 years). East/West Grand Terre Islands Restoration. State Project Number: BA-30 Project Priority List (PPL): 09 Federal Sponsor: National Marine Fisheries Service (NMFS) Project Types: Barrier Island, Marsh Creation Construction Completion Date: Pending Description: The goal of this project is to stabilize and benefit 1,575 acres of barrier island habitat and extend the island's life expectancy. Dredged material will be used to create dune and marsh habitat on East Grand Terre Island. http://dnr.louisiana.gov/crm/coastres/projectlist.asp
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.