Mike Tynan Chief Executive Officer March 2014
2
Imperatives for the UK Civil Nuclear Industry
3
Diverse Technology UK Imperatives Civil Nuclear
4
Economic Strike Price UK Imperatives Civil Nuclear
5
Develop UK Advanced Manufacturing Capability and Capacity UK Imperatives Civil Nuclear
6
Creating long term, sustainable, high value jobs UK Imperatives Civil Nuclear
7
Site of the Advanced Manufacturing Park – Orgreave Coal Mining Restoration Scheme (1994) Coking works – 1990 before demolition Cleaned up extensive contamination and dereliction from 200 years of mining Recovered four million tonnes of shallow coal reserves
8
Nuclear AMRC Purpose To help UK manufacturers win work
9
Nuclear AMRC Key Objectives 1.To raise the quality, capability and cost-competitiveness of the UK civil nuclear manufacturing supply chain, to a level of “best global practice” 2.To work with UK Manufacturers and develop world- leading manufacturing processes and technologies
10
Tier 2: Tier 1: March 2014
11
We Operate in the UK Civil Nuclear Market Place Nuclear New Build Existing Nuclear Fleet Nuclear Decommissioning
12
Nuclear AMRC Work Programmes Getting companies to market, and developing their capability and cost-competitiveness Supplier Development Programme Ensuring capability to compete on cost, quality and time to delivery Innovative Manufacturing Programme
13
Supplier Development Programme Sharing in Growth Fit for Nuclear Supporting Programmes
14
SafetyQualitySkills
15
Innovative Manufacturing Machining Welding Virtual Reality
16
Nuclear AMRC Technology Themes Welding & Cladding Structural Integrity Advanced Machining Inspection & NDE Applied Metrology Mechanisation & Automation Thermal & Surface Treatment Modeling, Simulation & Visualisation Materials Development Assembly Productivity & Manufacturing Optimisation Design & Quality Additive Layer Processes Hot Isostatic Pressing (HIPing)
17
State of Play
18
Supplier Development Sharing in Growth £38m over 4 years: £18m for supplier development 15 companies in two tranches Tranche 1 (5 companies): selected and work commenced Tranche 2 (10 companies): in final assessment Fit for Nuclear (F4N) £2-4m over 2-4 years Interventions with 300 - 400 firms 130 firms assessed to date
19
Nuclear AMRC Shopfloor TBT Deep Hole BorerInstalled Machining – 5 multi-axis Milling and Turning sets (5 through 9 axis) – TBT Deep Hole Borer Welding – GTAW – Multi-wire SAW – Groove SAW – Orbital Welding Cell – Shaped Metal Disposition – Pro-beam EBW – Submerged Arc Cladder – Narrow Gap welder
20
Nuclear AMRC Shopfloor Soraluce HBM 5-sided Complex Machining Set Commissioning/Installing Large EBW 1m3 HIP Diode Laser Cladder Co-ordinate Measuring Machine (CMM) facility Soraluce HBM Starrag 60 tonne VTL Fully Operational Autumn 2014
21
Virtual Reality (VR) ■ Full immersion, interactive “cave” ■ Interactive “power wall” ■ Capability: –Training in nuclear environments –Virtual Product visualisation –Assembly and Maintenance simulation –Factory layout optimisation linked to Discrete Event Simulation
22
HVM Catapult
23
High Value Manufacturing Catapult The High-Value Manufacturing Catapult (HVMC) is a consortium of 7 world- leading research centres with £350m public & private investment and working with over 160 industrial partners. It receives grant funding of around £30m per annum