Download presentation
Presentation is loading. Please wait.
Published bySavion Colyer Modified over 10 years ago
1
Start-up Package A reference Guide B C Forest Service M F
2
Start-up Package Contents ► Introduction – ESF ► As Built Roads ► ESF – FTA on June 1 st ► XML/GML ► BCeID ► Service Providers ► ESF FTA Training ► Exhibit A ► Mapping Standards ► Cutblock Labeling ► RESULTS ► Error messaging strategy ► Failed Submissions Strategy ► Roles and Resp. of District Contacts ► Role and Resp. of Regional Contacts
3
Start-up Package ► The Start-up package is developed to help guide districts with the implementation of ESF ► It contains ESF information and steps to be taken by District and Regional staff ► The package also contains information and key messages that should be passed on to local licensees
4
Introduction Introduction to ESF Legislative Reporting Requirements ESF – FTA on June 1st
5
Introduction to ESF Electronic Forest Management Initiative (e ‑ FM) ► e-Access, e.g. online harvest billing information, Silviculture and tenure reporting ► e-Records, e.g. electronic invoices for payment, i-expense ► e-Training, e.g. FRPA Training, Learn Link ► e-Submissions, e.g. Electronic Submission Framework (ESF), ECAS, HBS
6
Support and Direction Bill 13 (Electronic Transactions Act), “record be in writing is satisfied if the record is in electronic form”, “signature of a person, that requirement is satisfied by an electronic signature”, “use is not mandatory” Bill 74 (Forest and Range Practices Act), Section 142 “the furnishing of information on request or at specified times, and in a specified format including electronically”
7
Major electronic submission applications ► ESF – Electronic Submission Framework ► ABR – As Built Roads ► FTA – Forest Tenure Administration ► RESULTS – Reporting Silviculture Updates and Landstatus Tracking System ► ECAS – Electronic Commerce Appraisal System ► HBS – Harvest Billing System ► SPAR – Seed Planning and Registry
8
ESF and E-submissions ECAS HBS SPAR FTA RESULTS AS Built Roads ESF Portal
9
Electronic Submission Applications These will: Reduce the number of requests for information from clients, (save time and money for both) Reduce the volume of paper submissions Reduce the manual processing of information Capture data once at source eliminating duplicate data entry
10
Electronic Submission Framework - ESF ► Single interface for all stakeholders ► Shared data management and accessibility ► Improved Data quality ► Secure website ► Automation of business process ► One consistent, standard data format
11
ESF Objectives ► Map and attributes always together ► Information accessible to clients ► Reduce manual processing of map and report information ► Reduce transcribing and reconciliation errors ► Improve collection and integration of information ► Reduce administrative effort of MoF/MSRM staff and clients
12
ESF Objectives ► Reduce time for approval process ► Potential cost reduction ► MoF Districts will no longer capture/enter spatial and attribute data for licensee tenure and silviculture data ► Silviculture data (spatial and attribute) will be available via RESULTS for Inquiry, Reporting and for DDM approval ► Overall precision/accuracy of data will improve with less human intervention/filtering
13
Legislative requirements - Overview RESULTS - Reporting ► More details provided under the RESULTS section ► After June 1 Woodlot Licence are required to submit annual reports by April 30, 2006 As Built Roads ► Under the Forest Planning and Practices Regulations, Section 86(2) and (3) and Forest Road Regulation, Section 8(3), agreement holders are required to report the previously as-built road information to the District Manager, in manner prescribed by the Minister ► It has been determined that the information will be reported electronically
14
Legislative requirements - Overview As Built Roads - ABR ► The Deadline for the first submission for roads built to cover the time period April 1, 2003 to March 31, 2005 is December 31, 2005 ► For more information on ABR, see the ESF website : http://www.for.gov.bc.ca/his/esf/index_abr.htmhttp://www.for.gov.bc.ca/his/esf/index_abr.htm Road Permit Clearance As Built Roads
15
ESF-FTA after June 1 ► We will be working in the electronic format ► No hard copy submissions are required to populate the corporate systems ► Application triggers may be required but are optional application letter/e-mail for FTA, outlining the term and effective date appraisal maps for ECAS
16
ESF-FTA after June 1 ► Supporting hard copy information will be required in some circumstances TMS report for tenures with conflicts outlining rationale for approval Road layout and design schedules for approval as required by s 5.1 FRR
17
ESF-FTA after June 1 ► There is no statutory requirement for tenures to be submitted electronically Ministry direction to go to e-business ► Makes good business sense to populate our systems electronically Effective Efficient
18
Questions Introduction to ESF Legislative Reporting Requirements ESF – FTA after June 1 B C Forest Service M F
19
ESF XML/GML BCeID Service Providers FTA Training
20
ESF = XML and GML ESF is... Designed on top of industry technology standards (XML / GML) XML = Extensible Markup Language — language for documents that contain structured data — Attributes GML = Geography Markup Language is a subset of XML that includes both spatial and non ‑ spatial properties of geo features — Linework
21
BCeID BCeID Registration: ► Government IDs given to companies to securely access BC Government internet sites ► Enrolment package is sent to the company ► Company identifies a profile manager ► Profile manager manages IDs for their company.
22
BCeID Approaches to Electronic Submissions ► In ‑ house systems and resources ► Use of qualified service providers Access for Service Providers ► Consulting companies can submit on behalf of a license by using Forest Company’s BCeID account ► Licensees are responsible to manage their own account (data) ► http://www.for.gov.bc.ca/his/esd/bceidrequest.htm http://www.for.gov.bc.ca/his/esd/bceidrequest.htm
23
Service Providers for FTA ► List of Service Providers (Request for Expression of Interest) ► Integrated Woods Services Ltd. ► Forsite Consultants Ltd. ► Cariboo Forest Consultants Ltd. ► Coast Forest Management Ltd. ► Inland Timber Management Ltd. ► J.S. Thrower & Associates Ltd. ► Spatial Mapping Ltd. ► Pacific Geo Tech Systems Ltd. ► BC Network ► Chartwell Consultants Ltd.
24
Service Providers for FTA Not Inclusive nor Exhaustive IMG is currently reviewing list for new qualified providers who wish to be listed Please ensure that the service providers are able to submit for As Built Roads and RESULTS before using their services http://www.for.gov.bc.ca/his/esd/serviceproviders.htm http://www.for.gov.bc.ca/his/esd/serviceproviders.htm
25
FTA Application Training for Staff and Licensees ► Request for Proposal (RFP) has been issued for additional training to be carried out through summer and fall
26
Questions XML/GML BEeID Service Providers ESF FTA Training B C Forest Service M F
27
Exhibit A and Mapping Standards By Ministry of Sustainable Resource Management Land Information BC Integrated Registry Branch
28
Exhibit A Working towards improved quality of Exhibit A by: ► enhancing FTA auto-generated Exhibit A ► implementing Tenure Update Tools (TUT) ► reviewing and updating standards
29
TENURE UPDATE TOOLS ► LIM staff will receive training in May/June 2005 ► ability to create legible Exhibit A that will meet legal requirements ► ability to view submissions in greater detail than is currently available with the standard web applications
31
ESF FTA INBOX MAP REPORT STATUS REVIEW RESOLUTION CLEARED ISSUE TENURE FTA EXHIBIT A ACCEPTABLE YES NO TUT EXHIBIT A RETURN EX A TO FTA ACCEPTABLE TUT FTA ESF EXHIBIT A WORKFLOW INDUSTRY SUBMISSION CREATE LINEWORK Tenure Update Tool CREATE LINEWORK MOF EZILINK Until June 1st After June 1 st, only for Range and non-major FLTC and Private land with timber reserve
32
MAPPING STANDARDS – PROGRESS TO DATE ► Report completed by Pat Ringwood for RTEB on “Description of Forest Act Tenures” ► Group formed to review Chapter 52 and prepare a draft for review ► Group formed to draft standards for FTA Exhibit A
33
ESF TENURE SUBMISSION STANDARDS ► ESF – FTA Submission Guide ► Industry Guide to Preparing Forest Tenure and Permit Documents via ESF ► ESF website: http://www.for.gov.bc.ca/his/esd/esubmissions.htm http://www.for.gov.bc.ca/his/esd/esubmissions.htm
34
Questions Exhibit A Mapping Standards
35
ESF Cutblock Labeling B C Forest Service M F
36
Cut Block Labelling and ID for FTA and RESULTS ► Cut Block Naming Convention Cutblock ID ► 10 - alpha, numeric, spaces ► no symbols ► Road Naming Convention Section ID ► 10 - alpha, numeric, spaces ► No symbols
37
Cut Block Labelling and ID for FTA and RESULTS If traditionally the district has changed the licensee submission so that the Section ID on the exhibit A is different than on the application, there is a need to communicate these changes to licensee MUST HAPPEN Either the district must accept the section of road the way the licensee calls it, or the licensee must call the section of road the way the district has it on the map. This is a communication issue with the district and the licensee
38
Website Electronic Submission Framework Website ► To the ESF submission Application: http://extranet7.for.gov.bc.ca/esf/init.do http://extranet7.for.gov.bc.ca/esf/init.do ► Many Links off http://www.for.gov.bc.ca/his/esfhttp://www.for.gov.bc.ca/his/esf
41
Questions Cut Block Labeling B C Forest Service M F
42
ESF and RESULTS Overview ESF Transform Industry, BCTS, Consultants FTA RESULTS Op DB Spatial SRM LRDW Copy OP DB Attribute MoF TMS Website Map Report Client Ministry
43
Legislative Changes RESULTS Reporting ► Forest Practices Code of BC Act ► Timber Harvesting and Silviculture Practices Regulations — Section 45 - 48 Form A, B, and C
44
Legislative changes, submissions and requirements ► FPC Act Section 42.1 ► Operational Site Planning Regulation Section 7.1 and 7.3 Approval of amendments Minor Major amendments Stocking Standards - Approval thru results ► Woodlots Annual Reports — Regulation
45
Legislated RESULTS Reporting Requirements by ESF Submitter Major licensees Community Forest Agreement THSPR s45-48 (code) FPPR s86 (FRPA) Woodlot licensees WLFMR s86 (Code) WLPPR s76 (FRPA) Community Salvage Licence FPPR s46.1 (FRPA) FPPR s86 (FPRA) BC Timber Sales Report by Policy (Code) FPPR 86 (FRPA) District Manager (NRFL, FLC) FRPA 30 / FPPR s46 Report by Policy Third Party Transfers FRPA 29.1 / FRPA 94 / FPPR 86
46
Non Replaceable Forest Licence ( NRFL) & Forestry License to Cut ► District Manager has free growing obligation (plan, report, declare) ► District Manager as the submitter ► EziLink tool to create ESF submission ► Minister must report free growing accomplishments as part of MOF Service Plan Reporting
47
RESULTS Submission Types Before June 1, 2005 ► Paper Forms, maps, amendments, standards Licensees send paper submissions to district office who forwards to service providers or entered by district staff ► On-line directly into RESULTS Amendments, Stocking Standards proposals, Declarations ► ESF Opening Definition, Disturbance and Activity report, Forest Cover and Declarations RESULTS v1.5 currently in use RESULTS v2.0 release planned May 10, 2005
48
RESULTS Submission Types After June 1, 2005 ► On-line directly into RESULTS ► ESF Submissions RESULTS v2.0 release planned May 10, 2005 RESULTS v3.0 release planned Jan 2006 ► No more Paper
49
On-Line Submission Examples ► RESULTS v 1.5 (currently) Standards proposals Updates / corrections Amendments / approved variation Declarations ► RESULTS v 2.0 (additional after May) Annual silviculture treatment summary Opening amalgamations Section 108 applications
50
ESF Submission Types ► RESULTS v 1.5 (current) Opening definition / stocking standards ID Disturbance activity Silviculture activity (spatial optional) Forest cover updates Declarations ► RESULTS v 2.0 (after May 10 th ) Amendments, updates, approved variations Annual Silviculture Treatment Summary for FRPA blocks WTP’s as a layer Seed transfer rule violation tracking Automatic opening number generator
51
What do you need to start? In addition to BCeID / IDIR and ESF submitter Users need to get assigned RESULTS roles: RESULTS View – look only RESULTS Update – allows for making changes and submitting stocking standards and amendment requests RESULTS Declaration – adds milestone declarations to what can be done. RESULTS Approval – MoF only allows for approval of amendments and stocking standard applications. CRS Authority – For generating reports (comes with IDIR, but not with BCeID
52
ESF & RESULTS Authority versus Legally Authorized to Submit ► ESF Submitter Company Profile Manager and IMG ► RESULT Update & Declaration BCeID holder and IMG ► Authorized by Agreement holder, BCTS Manager, District Manager Licensee signing matrix ► Professionally qualified, RPF Amendments, standards proposals, declarations
53
Go to the web page for dates and registration RESULTS Training RESULTS OVERVIEW OBLIGATION REPORTING (SUBMISSIONS) AMENDMENTS, UPDATES, and APPROVED VARIATIONS STOCKING STANDARDS RESULTS and MAPVIEW GENERATING REPORTS - BASIC GENERATING REPORTS - ADVANCED GENERATING REPORTS – PLANNING ASSISTANCE For info email lhooper@forsite.ca http://www.learningestore.com/bcmof
54
RESULTS Timelines ► April 31 st, 2005 End of fiscal 2005 and RESULTS reporting period ► May 10 th, 2005 RESULTS v2.0 release date new functionalities added to ESF and RESULTS ► May 31, 2005 All 2004/05 silviculture reports must be submitted ► June 1 st, 2005 E-submissions mandatory for 2005/06 reporting All remaining paper submissions for 2004/05 reporting period are sent to service providers or entered by district staff ► Jan 31 st, 2006 RESULTS v3.0 with Workflow added and data/process streamlining ► May 31 st, 2006 All 2005/06 silviculture reports must be submitted ► Application Bulletins: Webpage: http://www.for.gov.bc.ca/pscripts/his/apb/profile.asp
55
Managing the RESULTS InBox ► Licensee submits Amendments Standards ► Ministry reviews details, approves or rejects Amendments Standards ► Inbox Clean up of DRAFT openings
56
District Manager Responsibilities in the Electronic World ► No longer manually signing SP amendment approval letters ► No longer manually signing stocking standard proposals ► Use RESULTS InBox to Retrieve/review then accept or reject E-mail notification is sent to licensee ► As Data Resource Managers, DM is responsible for accurate entry of data according to standards set by Data Custodian
57
Running Reports ► Milestone reports Regeneration Free growing These reports will be run on a routine basis to track declarations ► Opening Summary This report will be provide a detailed summary of all information in RESULTS for a specified opening(s). ► FDP & FSP Standards Report Prints out standards under a FDP or FSP in either a.pdf or.csv format
58
Wildlife Tree Retention ► Licensees required at completion of harvesting to retain 7.0% of the total area of the cutblocks harvested in the fiscal year and 3.5% of a cutblock ► Compliance reporting will use RESULTS forest cover submission areas and attributes ► Wildlife tree retention areas may relate to more than one cutblock, therefore each retention area polygon must be related to a RESULTS opening. ► Forest cover submissions will assign reserve polygons a Reserve type: riparian, wildlife, dispersed, other ► Forest cover submission sent to layer in the LRDW that will then be used as encumbrance in the Exhibit A report.
59
Tenures and Stewardship Roles ► Must work together ► Blocks not in FTA must be resolved ► Review of FDP/FSP stocking standards and amendments roles ► Cutblock naming convention ► Opening number assignments ► TSR and links to FSP ► District needs to ‘map’ their business flow ► See CD for RESULTS Business Mapping from Chilliwack Forest District information
60
Questions RESULTS on June 1st B C Forest Service M F
61
ESF Error Messages Failed Submissions APPHELP
62
Error messaging strategy ► Improved Error Messaging for RESULTS is now available ► FTA will have significantly better error messages by June 1 ► The plan is to have an English descriptive error message which will be linked to a web based description of the solution
63
Failed Submission Strategy ► Planning meeting has been held ► Dona Stapley will head up a working group of district, regional, branches, licensee and consultants formed. The group will make recommendations as to how to best deal with failed submissions ► Present Recommendation District staff are the first point of contact for failed ESF and RESULTS submissions
64
APPHELP The first line of support for failed submissions is the District Contact. Most errors are data related and can be solved by district staff Once the district contact has determined that it is a system or data related issue, they will forward problem to APPHELP If problem is not resolved at APPHELP, then it escalates to HQ specialist From there it escalates to Programming Contactors — VIVID/Pangaea Advice: Subscript to Notifications Updates
65
Questions Error Messages Failed Submissions APPHELP
66
Roles and Responsibilities District Contacts B C Forest Service M F
67
District Contacts Roles and Responsibilities of District Contacts: The current list of District contacts was established to assist in identifying district participants and help organize the workshops In the Deputy Minister’s letter to licensees, commitment was made to identify contacts to help with issues arising from submissions District Contact will establish joint ESF working groups with licensees so that they are aware of procedures Failed Submission and APPHELP procedures point to the district contacts as the first line of support
68
Process to identify the District Contact: In the Business Mapping section in the afternoon, get into a group discussion regarding: The anticipated types and volume of calls from licensees; The level of knowledge required to understand the nature of the call and to either solve them or re ‑ direct them to appropriate persons in the district or APPHELP Time and work load factor (no more paper maps to handle) and training requirements.
69
Process to identify the District Contact: The nature and volume will be dependent of the readiness of licensees and the number of new licensees who will be submitting for the very first time. Please consider both FTA and RESULTS applications and the possibilities of licensees going to service providers. Come up with a proposal for the district contact to take back to your DMT. You may also want to suggest alternates.
70
District/Licensees Working group set up Structure — District e-FM Group and selection of Licensee District Contact person: Include staff that is doing work on any of the business applications in the district. Remember all of the systems that we have are inter ‑ related at some point Select a chair for the group (could also be the district contact) Select the District Contact.
71
Initial Tasks Form e-FM Group — Chair and/or District Contact Debrief DMT and get approval for District Contact Complete ESF integration business mapping for All CP and RP processes e-FM Group (2-5) Tenures and Engineering LIM/GIS Stewardship Corporate Services C & E
72
Initial Tasks Present learning’s from ESF Workshop at an all Staff Meeting Send out invitation to Licensees, including Woodlot and BCTS, regarding the formation of the joint working group Set a meeting date and time before June 1 - suggest no more than a half day meeting e-FM Group Licensees Joint Licensee Working Group
73
Key Messages to delivery to Licensees (All licensees including BCTS, WL and CFL) Have you heard about ESF and the extension? Is your company ready to submit electronically after June 1? Do you know the key deadlines for ABR and RESULTS and what your company is planning to do to get ready? Are you going to be using service providers and who are they? Review New Mapped Business Processes
74
Key Messages to delivery to Licensees (All licensees including BCTS, WL and CFL) Know your District Contact Formation of the Joint Working Group — all licensees or only representatives from majors and WL associations? Forum for discussing Data issues. Long term role of e ‑ FM Group — meet to prepare before the other two deadlines (ABR and RESULTS)
75
Questions District Contacts B C Forest Service M F
76
Roles and Responsibilities Regional Contacts B C Forest Service M F
77
Regional Contacts Roles and Responsibilities of Regional Contacts: After the June 1 implementation deadline, the Regional Contacts will have to take on the role providing leadership and coordination for the Districts. Help and monitor the formation of the District Licensees joint working groups. Report out to Provincial Coordinator regarding the formation of the District e-FM group, and the holding of the first joint licensee meeting before June l
78
Process to identify the Regional Contact There will be a need to assess the current representation in view of the commitment and work load requirements. In addition, a decision should be made as to if this person should be from the regional or district office. The provincial coordinator will assist in this process.
79
Questions Regional Contacts B C Forest Service M F
80
Business Map p ing Building ESF into your business process B C Forest Service M F
81
Building ESF into your business process ► You should have at least one current mapped business process here today ► For the mapping exercise: Review where ESF will change your business flow Redesign Determine who will be responsible for handling the InBox’s Where all outputs (such as ECAS, Exhibit A etc ) will converge to produce a CP/RP for final approval
82
Building ESF into your business process Define key success factors and performance measurements If time permits, start a route card Appoint a presenter and report back to the group
83
Main CP Process Triggers - E-mail or Letter and 2 appraisal maps START Tenures Initiates route cards Lim Starts Clearance Starts ECAS Process Document Preparation Queue Document to DM or Designate for signature District Staff FTA Approval Distribute doc to Licensee/File ECAS Approval END Tenure Flow- Overview
84
► THE END B C Forest Service M F
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.