Seymour Capilano Filtration Project Seymour Capilano Twin Tunnels
June 4, 2010 Goran Oljaca P.Eng.
2
Seymour Capilano Filtration Plant & Twin Tunnels
3
Seymour Capilano Filtration Plant
4
Capilano Energy Recovery Facility Pipeline corridor Pump station
Twin Tunnels portals site
5
Pump Station
6
Inside the Break Head Tank
7
Break Head Tank / Energy Recovery Facility
Filtration Plant 1800 ML/d (20.8 m3/s) capacity Capilano Pump Station 1080 Ml/d (12.5 m3/s) 16,000 HP (12,000 KW) Break Head Tank / Energy Recovery Facility Facility Flow range 0 – 12.5 m3/s Turbine flow range 3 – 7.5 m3/s PRV flow range (each) 0 – 12.5 m3/s Generating capacity 1.7 MW Annual Energy Generated 9500 MW.h
9
Twin Tunnel Progress
10
Untreated Water Tunnel
Twin Tunnels Treated Water Tunnel Untreated Water Tunnel
11
Gantry Crane Over Seymour Access Shaft
12
Top of Seymour Tunnel Shaft
May 1, 2006
13
Seymour Shaft
14
Looking into the ‘tail tunnel’
15
Seymour Shaft Base Entrance to Twin Tunnels
16
Seymour Shaft Base
18
Muck Bucket
19
Tunnel Boring Machine
20
Untreated (Raw) Water Tunnel
October 6, 2009
21
Reinforcing mesh and rock bolts
22
Treated Water Tunnel Sept. 1, 2009
23
Treated Water Tunnel
24
Untreated Water Tunnel
25
Untreated Water Tunnel Class 5 Support
26
Shotcrete Installation
27
Pump Station
28
Discharge Water Quality
30
Pond 3
31
Capilano Shaft Site Twin Tunnels Portals Site
32
Capilano Raise Bore
33
Cleveland Dam Spillway
Reaming Raise-bore operation 250m to residence Pumping Station Cleveland Dam Spillway 270m deep shafts Twin Tunnels
34
Liner Storage
35
Install Shaft Steel Liner
36
Temporary Silos for Grouting
37
Public Impacts and Mitigation Measures
Truck traffic Noise Vibrations Air quality Landscaping and restoration
38
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.